Wage Determination MN20260020-15559-res

Scott, MN · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MN20260020-15559-res covers 33 trade classifications for residential construction in Scott, MN. Total packages (base + fringe) range from $11.50/hr to $94.79/hr, with the highest going to MISSISSIPPI RIVER)). Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MN20260020-15559-res
Revision: 1
Type: residential
County: Scott
State: MN
Effective: May 17, 2026
Trades covered: 33
Highest rate: $94.79/hr
Official source: SAM.gov reference MN20260020View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE, WASHINGTON) $40.63 $28.42 $69.05 $0.00 $0.00 $0.00 $0.00
CARPENTER (SHERBURNE) $40.63 $28.42 $69.05 $0.00 $0.00 $0.00 $0.00
CARPENTER (SHERBURNE) $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ANOKA, DAKOTA, RAMSEY, SHERBURNE, AND WASHINGTON COUNTIES) $53.91 $36.48 $90.39 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE) $44.12 $22.57 $66.69 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE) $43.67 $22.35 $66.02 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON $32.41 $17.44 $49.85 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON $28.46 $15.82 $44.28 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER $32.91 $17.44 $50.35 $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER $28.96 $15.82 $44.78 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 $0.00 $0.00 $0.00 $0.00
MISSISSIPPI RIVER)) $59.00 $35.79 $94.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE $33.44 $15.95 $49.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER $30.30 $15.95 $46.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.89 $17.41 $49.30 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $31.45 $17.85 $49.30 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY (SHERBURNE) $31.45 $17.85 $49.30 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE $24.91 $13.31 $38.22 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $51.70 $42.45 $94.15 $0.00 $0.00 $0.00 $0.00
PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE) $48.33 $40.46 $88.79 $0.00 $0.00 $0.00 $0.00
PIPEFITTER (SHERBURNE COUNTY) $48.33 $40.46 $88.79 $0.00 $0.00 $0.00 $0.00
PLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY $59.54 $33.26 $92.80 $0.00 $0.00 $0.00 $0.00
PLUMBER (SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY $53.16 $32.21 $85.37 $0.00 $0.00 $0.00 $0.00
PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY $50.23 $37.52 $87.75 $0.00 $0.00 $0.00 $0.00
ROOFER $39.01 $21.99 $61.00 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.60 $25.14 $60.74 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY: LABOR DAY $45.01 $26.53 $71.54 $0.00 $0.00 $0.00 $0.00
View all WDs for Scott → Revision history →