Wage Determination MN20260008-15602-res

Sibley, MN · residential · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MN20260008-15602-res covers 65 trade classifications for residential construction in Sibley, MN. Total packages (base + fringe) range from $22.00/hr to $100.96/hr, with the highest going to PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, I. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MN20260008-15602-res
Revision: 1
Type: residential
County: Sibley
State: MN
Effective: May 17, 2026
Trades covered: 65
Highest rate: $100.96/hr
Official source: SAM.gov reference MN20260008View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
& STIFFLEG); TOWER CRANE UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT $33.44 $15.95 $49.39 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $55.34 $34.03 $89.37 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.00 $31.14 $79.14 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON $45.11 $25.61 $70.72 $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON $45.11 $25.61 $70.72 $0.00 $0.00 $0.00 $0.00
CARPENTER $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY) $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
CARPENTER: WOOD FRAME CONSTRUCTION $36.71 $20.17 $56.88 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.46 $23.47 $69.93 $0.00 $0.00 $0.00 $0.00
COUNTY) $21.97 $15.79 $37.76 $0.00 $0.00 $0.00 $0.00
COUNTY) $23.64 $16.57 $40.21 $0.00 $0.00 $0.00 $0.00
COUNTY) $20.84 $14.70 $35.54 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER/FINISHER $19.00 $25.79 $44.79 $0.00 $0.00 $0.00 $0.00
DRYWALL: FINISHER $30.17 $18.67 $48.84 $0.00 $0.00 $0.00 $0.00
DRYWALL: SANDER $22.63 $18.67 $41.30 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $23.32 $63.57 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER CABLE SPLICER = $1.00 ADDITIONAL PER HOUR $44.12 $22.57 $66.69 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION CABLE SPLICER = $1.00 ADDITIONAL PER HOUR $43.67 $22.35 $66.02 $0.00 $0.00 $0.00 $0.00
GLAZIER $50.98 $27.35 $78.33 $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.00 $34.11 $77.11 $0.00 $0.00 $0.00 $0.00
LABORER $30.83 $17.61 $48.44 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, C $22.84 $16.57 $39.41 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, C $20.04 $14.70 $34.74 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTA $23.54 $16.57 $40.11 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTA $20.74 $14.70 $35.44 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON $20.84 $16.57 $37.41 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON $18.04 $14.70 $32.74 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CE $21.17 $15.79 $36.96 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CE $18.35 $13.94 $32.29 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR $21.88 $15.79 $37.67 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR $19.06 $13.94 $33.00 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON $19.17 $15.79 $34.96 $0.00 $0.00 $0.00 $0.00
LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON $16.35 $13.94 $30.29 $0.00 $0.00 $0.00 $0.00
LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS $16.26 $9.68 $25.94 $0.00 $0.00 $0.00 $0.00
LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS $28.25 $16.20 $44.45 $0.00 $0.00 $0.00 $0.00
LATHER $39.55 $28.63 $68.18 $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $45.47 $26.33 $71.80 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.95 $36.81 $79.76 $0.00 $0.00 $0.00 $0.00
PAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OT $19.00 $3.00 $22.00 $0.00 $0.00 $0.00 $0.00
PAINTERS: 4 STORIES: BRUSH & ROLLER PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER T $35.28 $25.49 $60.77 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER $31.45 $17.85 $49.30 $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY $31.45 $17.85 $49.30 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, I $62.52 $38.44 $100.96 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $37.05 $30.27 $67.32 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $48.33 $40.46 $88.79 $0.00 $0.00 $0.00 $0.00
PLASTER TENDER $21.97 $15.79 $37.76 $0.00 $0.00 $0.00 $0.00
PLASTERER $42.52 $30.37 $72.89 $0.00 $0.00 $0.00 $0.00
PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY $59.54 $33.26 $92.80 $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES GAS FITTERS FOOTNOTE: PAID HOLIDAY: LABOR DAY $36.78 $34.51 $71.29 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB; & TOWER CRANE 250' & OVER $35.19 $15.95 $51.14 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OV $34.85 $15.95 $50.80 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER; LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR; & TRACTOR OPERATOR WITH BOOM $33.10 $15.95 $49.05 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD $31.42 $15.95 $47.37 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER; TRUCK CRANE OILER; & WELDING MACHINE $30.30 $15.95 $46.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER; OILER OR GREASER; & ELEVATOR $28.29 $15.95 $44.24 $0.00 $0.00 $0.00 $0.00
ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY $48.32 $25.54 $73.86 $0.00 $0.00 $0.00 $0.00
ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER; HOIST ENGINEER; STRADDLE CARRIER; POW $32.93 $15.95 $48.88 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY $45.01 $26.53 $71.54 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $42.94 $27.26 $70.20 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $44.36 $22.35 $66.71 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $42.67 $22.04 $64.71 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $40.60 $21.94 $62.54 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.50 $8.20 $36.70 $0.00 $0.00 $0.00 $0.00
TILE LAYER $34.92 $21.81 $56.73 $0.00 $0.00 $0.00 $0.00
TILE LAYER $39.17 $10.16 $49.33 $0.00 $0.00 $0.00 $0.00