Wage Determination MI20260157-15442-hvy

Antrim, MI · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260157-15442-hvy covers 7 trade classifications for heavy construction in Antrim, MI. Total packages (base + fringe) range from $36.37/hr to $65.03/hr, with the highest going to POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER, SIDE BOOM, TRENCHER, ENDLOAD. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260157-15442-hvy
Revision: 1
Type: heavy
County: Antrim
State: MI
Effective: May 17, 2026
Trades covered: 7
Highest rate: $65.03/hr
Official source: SAM.gov reference MI20260157View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
LABORER: DISTRIBUTION WORK: ZONE 1 - MACOMB, OAKLAND AND WAYNE DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DIST $28.41 $13.45 $41.86 $0.00 $0.00 $0.00 $0.00
LABORER: DISTRIBUTION WORK: ZONE 2 - MONROE AND WASHTENAW DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUT $24.55 $13.45 $38.00 $0.00 $0.00 $0.00 $0.00
LABORER: DISTRIBUTION WORK: ZONE 3 - BAY, GENESEE, LAPEER, MIDLAND, SAGINAW, SANILAC, SHIAWASSEE AND ST. CLAIR DISTRIBUTION WORK - THE CONSTRUCTION, I $23.55 $13.45 $37.00 $0.00 $0.00 $0.00 $0.00
LABORER: DISTRIBUTION WORK: ZONE 4 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINE $22.92 $13.45 $36.37 $0.00 $0.00 $0.00 $0.00
LABORER: DISTRIBUTION WORK: ZONE 5 - REMAINING COUNTIES IN MICHIGAN DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF $22.95 $13.45 $36.40 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER, SIDE BOOM, TRENCHER, ENDLOAD $39.78 $25.25 $65.03 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2 DOZER, ENDLOADER, SIDE BOOM, BACKFILLER, PUMPS, BOOM TRUCK, TRACTOR $36.05 $25.25 $61.30 $0.00 $0.00 $0.00 $0.00
View all WDs for Antrim → Revision history →