Wage Determination MI20260151-15485-bld
Shiawassee, MI · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination MI20260151-15485-bld covers 37 trade classifications for building construction in Shiawassee, MI. Total packages (base + fringe) range from $12.84/hr to $82.05/hr, with the highest going to MILLWRIGHT. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MI20260151-15485-bld
Revision: 2
Type: building
County: Shiawassee
State: MI
Effective: May 17, 2026
Trades covered: 37
Highest rate: $82.05/hr