Wage Determination MI20260150-15514-bld
Schoolcraft, MI · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MI20260150-15514-bld covers 27 trade classifications for building construction in Schoolcraft, MI. Total packages (base + fringe) range from $14.95/hr to $81.14/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MI20260150-15514-bld
Revision: 1
Type: building
County: Schoolcraft
State: MI
Effective: May 17, 2026
Trades covered: 27
Highest rate: $81.14/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.24 | $30.56 | $75.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.19 | $24.65 | $56.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $33.43 | $21.78 | $55.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $17.50 | $2.27 | $19.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 | $68.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $28.18 | $13.45 | $41.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $41.00 | $23.43 | $64.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $28.73 | $15.92 | $44.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: ROLLER | $16.58 | $2.84 | $19.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $45.44 | $28.43 | $73.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER.$ 34.59 27.53 PIPEFITTER | $34.59 | $27.53 | $62.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER PREMIUM RATE: MAIN BOOM AND JIB 3 | $40.51 | $25.00 | $65.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN | $35.86 | $12.50 | $48.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $19.10 | $8.00 | $27.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $27.24 | $29.85 | $57.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $32.74 | $29.85 | $62.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.19 | $24.65 | $56.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 | $0.00 | $0.00 | $0.00 | $0.00 |