Wage Determination MI20260135-15511-bld

Marquette, MI · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260135-15511-bld covers 26 trade classifications for building construction in Marquette, MI. Total packages (base + fringe) range from $14.25/hr to $81.14/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260135-15511-bld
Revision: 1
Type: building
County: Marquette
State: MI
Effective: May 17, 2026
Trades covered: 26
Highest rate: $81.14/hr
Official source: SAM.gov reference MI20260135View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $44.92 $25.00 $69.92 $0.00 $0.00 $0.00 $0.00
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $44.63 $25.00 $69.63 $0.00 $0.00 $0.00 $0.00
220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $43.81 $25.00 $68.81 $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.24 $30.56 $75.80 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.19 $24.65 $56.84 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.17 $10.13 $30.30 $0.00 $0.00 $0.00 $0.00
GLAZIER $17.50 $2.27 $19.77 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING AND STRUCTURAL PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY $35.20 $32.97 $68.17 $0.00 $0.00 $0.00 $0.00
LABORER $28.18 $13.45 $41.63 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $14.25 $0.00 $14.25 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.00 $23.43 $64.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 $0.00 $0.00 $0.00 $0.00
PAINTER $28.73 $15.92 $44.65 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $17.81 $2.87 $20.68 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.44 $28.43 $73.87 $0.00 $0.00 $0.00 $0.00
PLUMBER.$ 34.59 27.53 PIPEFITTER $34.59 $27.53 $62.12 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER PREMIUM RATE: MAIN BOOM AND JIB 3 $40.51 $25.00 $65.51 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE $37.26 $25.00 $62.26 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN $35.86 $12.50 $48.36 $0.00 $0.00 $0.00 $0.00
ROOFER $26.50 $15.95 $42.45 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $27.24 $29.85 $57.09 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $32.74 $29.85 $62.59 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.19 $24.65 $56.84 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $17.44 $4.51 $21.95 $0.00 $0.00 $0.00 $0.00
View all WDs for Marquette → Revision history →