Wage Determination MI20260131-15438-bld

Lenawee, MI · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260131-15438-bld covers 41 trade classifications for building construction in Lenawee, MI. Total packages (base + fringe) range from $12.84/hr to $82.05/hr, with the highest going to MILLWRIGHT. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260131-15438-bld
Revision: 1
Type: building
County: Lenawee
State: MI
Effective: May 17, 2026
Trades covered: 41
Highest rate: $82.05/hr
Official source: SAM.gov reference MI20260131View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.00 $20.15 $56.15 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID H $35.83 $22.18 $58.01 $0.00 $0.00 $0.00 $0.00
CARPENTER $35.41 $21.06 $56.47 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.18 $18.11 $45.29 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $17.79 $66.19 $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $19.59 $7.57 $27.16 $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING & STRUCTURAL $35.50 $29.20 $64.70 $0.00 $0.00 $0.00 $0.00
LABORER $32.35 $13.45 $45.80 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $29.04 $9.76 $38.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.02 $7.07 $35.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26 $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $32.85 $20.41 $53.26 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION $51.30 $25.87 $77.17 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY $42.26 $23.70 $65.96 $0.00 $0.00 $0.00 $0.00
PLASTERER $27.41 $16.10 $43.51 $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION $49.43 $24.36 $73.79 $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION.$ 46.29 25.43 PIPEFITTER: HVAC PIPE INSTALLATION ONLY $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $51.29 $25.35 $76.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $49.79 $25.35 $75.14 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $48.29 $25.35 $73.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $47.99 $25.35 $73.34 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $47.17 $25.35 $72.52 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH $46.31 $25.35 $71.66 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMB $43.63 $25.35 $68.98 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND $35.29 $25.35 $60.64 $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.80 $21.51 $52.31 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $35.83 $22.18 $58.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77 $0.00 $0.00 $0.00 $0.00
View all WDs for Lenawee → Revision history →