Wage Determination MI20260129-15475-bld
Lake, MI · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MI20260129-15475-bld covers 37 trade classifications for building construction in Lake, MI. Total packages (base + fringe) range from $12.84/hr to $81.14/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MI20260129-15475-bld
Revision: 1
Type: building
County: Lake
State: MI
Effective: May 17, 2026
Trades covered: 37
Highest rate: $81.14/hr