Wage Determination MI20260104-17143-bld
Allegan, MI · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MI20260104-17143-bld covers 41 trade classifications for building construction in Allegan, MI. Total packages (base + fringe) range from $12.84/hr to $81.14/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MI20260104-17143-bld
Revision: 1
Type: building
County: Allegan
State: MI
Effective: May 17, 2026
Trades covered: 41
Highest rate: $81.14/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $35.21 | $24.34 | $59.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER (ALLEGAN COUNTY) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING D | $35.21 | $24.34 | $59.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.59 | $7.57 | $27.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $31.50 | $21.15 | $52.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.31 | $4.47 | $19.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING | $42.78 | $21.84 | $64.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING | $35.68 | $23.36 | $59.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $16.95 | $4.74 | $21.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $30.02 | $27.43 | $57.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $15.31 | $4.47 | $19.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION | $32.50 | $24.97 | $57.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION | $47.40 | $23.35 | $70.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY | $47.40 | $23.35 | $70.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY | $32.50 | $24.97 | $57.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $21.18 | $12.43 | $33.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION | $47.40 | $23.35 | $70.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION | $32.50 | $24.97 | $57.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L | $47.28 | $25.25 | $72.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR W | $43.93 | $25.25 | $69.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRAN | $39.57 | $25.25 | $64.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WI | $31.23 | $25.25 | $56.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.73 | $7.41 | $23.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $42.74 | $21.53 | $64.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $41.34 | $27.39 | $68.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $32.20 | $23.46 | $55.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER (ALLEGAN COUNTY) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING | $32.20 | $23.46 | $55.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | $0.00 | $0.00 | $0.00 | $0.00 |