Wage Determination MI20260085-15495-bld

Ionia, MI · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260085-15495-bld covers 47 trade classifications for building construction in Ionia, MI. Total packages (base + fringe) range from $10.47/hr to $80.24/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260085-15495-bld
Revision: 1
Type: building
County: Ionia
State: MI
Effective: May 17, 2026
Trades covered: 47
Highest rate: $80.24/hr
Official source: SAM.gov reference MI20260085View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $21.45 $5.00 $26.45 $0.00 $0.00 $0.00 $0.00
CARPENTER $18.62 $6.42 $25.04 $0.00 $0.00 $0.00 $0.00
CARPENTER $17.26 $2.69 $19.95 $0.00 $0.00 $0.00 $0.00
CARPENTER $18.49 $2.69 $21.18 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $28.29 $21.42 $49.71 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $36.21 $20.91 $57.12 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.16 $4.25 $21.41 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $15.91 $2.92 $18.83 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING $36.52 $25.15 $61.67 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING $42.98 $29.75 $72.73 $0.00 $0.00 $0.00 $0.00
GLAZIER $15.29 $2.68 $17.97 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $16.75 $2.75 $19.50 $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $36.55 $29.51 $66.06 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.13 $4.88 $23.01 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER $24.90 $12.95 $37.85 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER $32.53 $13.45 $45.98 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $10.47 $0.00 $10.47 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.87 $2.16 $21.03 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.01 $2.45 $16.46 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.32 $3.28 $21.60 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.50 $6.17 $22.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.50 $5.81 $24.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.28 $7.55 $26.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.16 $4.05 $21.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.72 $1.92 $17.64 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $28.75 $18.68 $47.43 $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.21 $2.81 $19.02 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION $47.40 $23.35 $70.75 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $47.40 $23.35 $70.75 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WOR $46.29 $25.43 $71.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 $42.74 $21.53 $64.27 $0.00 $0.00 $0.00 $0.00
ROOFER $13.86 $6.11 $19.97 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $17.88 $4.73 $22.61 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.94 $21.15 $49.09 $0.00 $0.00 $0.00 $0.00
TILE SETTER $32.20 $23.46 $55.66 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 $0.00 $0.00 $0.00 $0.00
View all WDs for Ionia → Revision history →