Wage Determination MI20260059-15495-hvy

Ionia, MI · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260059-15495-hvy covers 34 trade classifications for heavy construction in Ionia, MI. Total packages (base + fringe) range from $14.17/hr to $76.37/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260059-15495-hvy
Revision: 1
Type: heavy
County: Ionia
State: MI
Effective: May 17, 2026
Trades covered: 34
Highest rate: $76.37/hr
Official source: SAM.gov reference MI20260059View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $36.21 $21.06 $57.27 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.15 $12.78 $33.93 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.52 $25.15 $61.67 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.00 $31.37 $76.37 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.55 $12.95 $35.50 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.23 $3.58 $16.81 $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE $28.56 $12.95 $41.51 $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE $32.53 $13.45 $45.98 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.21 $1.96 $14.17 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.00 $4.66 $20.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $22.61 $8.40 $31.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.17 $5.84 $27.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.50 $5.10 $23.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.64 $0.00 $16.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.41 $4.97 $22.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEM $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $35.46 $25.25 $60.71 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $21.89 $11.85 $33.74 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $19.90 $5.63 $25.53 $0.00 $0.00 $0.00 $0.00
PLUMBER $39.89 $23.82 $63.71 $0.00 $0.00 $0.00 $0.00
PLUMBER $42.29 $23.94 $66.23 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 2 TRENCHER $41.25 $25.25 $66.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $16.50 $4.89 $21.39 $0.00 $0.00 $0.00 $0.00