Wage Determination MI20260050-15487-hvy

Barry, MI · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MI20260050-15487-hvy covers 34 trade classifications for heavy construction in Barry, MI. Total packages (base + fringe) range from $14.17/hr to $71.23/hr, with the highest going to POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MI20260050-15487-hvy
Revision: 1
Type: heavy
County: Barry
State: MI
Effective: May 17, 2026
Trades covered: 34
Highest rate: $71.23/hr
Official source: SAM.gov reference MI20260050View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $31.50 $21.15 $52.65 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.31 $12.83 $35.14 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.78 $21.84 $64.62 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $25.74 $66.74 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 $0.00 $0.00 $0.00 $0.00
LABORER $23.34 $11.60 $34.94 $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $22.42 $12.95 $35.37 $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.55 $12.95 $35.50 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.21 $1.96 $14.17 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.00 $4.66 $20.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $29.31 $2.64 $31.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.50 $5.10 $23.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.64 $0.00 $16.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.41 $4.97 $22.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLID $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEM $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $35.46 $25.25 $60.71 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $21.75 $11.94 $33.69 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.75 $11.94 $34.69 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $19.90 $5.63 $25.53 $0.00 $0.00 $0.00 $0.00
PLUMBER $42.29 $23.94 $66.23 $0.00 $0.00 $0.00 $0.00
PLUMBER $35.20 $22.35 $57.55 $0.00 $0.00 $0.00 $0.00
PLUMBER $39.89 $23.82 $63.71 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 2 TRENCHER $41.25 $25.25 $66.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Underground Construction- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $16.50 $4.89 $21.39 $0.00 $0.00 $0.00 $0.00
View all WDs for Barry → Revision history →