Wage Determination MI20260016-15497-res
Kalamazoo, MI · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MI20260016-15497-res covers 20 trade classifications for residential construction in Kalamazoo, MI. Total packages (base + fringe) range from $12.45/hr to $74.23/hr, with the highest going to 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MI20260016-15497-res
Revision: 1
Type: residential
County: Kalamazoo
State: MI
Effective: May 17, 2026
Trades covered: 20
Highest rate: $74.23/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 | $74.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $18.81 | $6.38 | $25.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $34.22 | $9.52 | $43.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $36.55 | $29.51 | $66.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.87 | $5.46 | $22.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.21 | $13.45 | $40.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE O | $45.68 | $25.25 | $70.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $21.75 | $11.94 | $33.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY | $31.35 | $22.90 | $54.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY | $27.18 | $21.05 | $48.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $24.71 | $5.04 | $29.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $33.98 | $18.51 | $52.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $32.00 | $10.73 | $42.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 | $0.00 | $0.00 | $0.00 | $0.00 |