CARPENTER: PILEDRIVER
|
$35.57 |
$21.54 |
$57.11 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER: PILEDRIVER (LIVINGSTON, MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES)
|
$41.37 |
$28.69 |
$70.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: ZONE 1 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, AL
|
$33.00 |
$18.51 |
$51.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: ZONE 2 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, AL
|
$31.50 |
$18.51 |
$50.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND
|
$50.97 |
$28.25 |
$79.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND
|
$52.15 |
$28.25 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND
|
$52.42 |
$28.25 |
$80.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND
|
$53.92 |
$28.25 |
$82.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND
|
$55.42 |
$28.25 |
$83.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
FLAG PERSON
|
$10.10 |
$0.00 |
$10.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY
|
$23.70 |
$6.95 |
$30.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: ALLEGAN, ANTRIM, BARRY, BENZIE, BRANCH, CALHOUN, CHARLEVOIX, EATON, EMMET, GRAND TRAVERSE, HILLSDA
|
$28.80 |
$27.43 |
$56.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY, GENESEE, LAPEER, LIVINGSTON, MACOMB, MIDLAND, OAKLAND, SAGINAW, ST. CLAIR, THE UNIVERSITY OF
|
$30.02 |
$28.13 |
$58.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: ALL OTHER WORK
|
$33.00 |
$27.20 |
$60.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREATER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DA
|
$39.91 |
$32.32 |
$72.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,000 PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY
|
$39.91 |
$32.32 |
$72.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDING ERECTOR
|
$31.75 |
$22.84 |
$54.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: ORNAMENTAL AND STRUCTURAL
|
$36.55 |
$35.93 |
$72.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: REINFORCING
|
$36.55 |
$32.87 |
$69.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 1
|
$35.51 |
$14.45 |
$49.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 2
|
$31.96 |
$14.45 |
$46.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 3
|
$35.82 |
$14.45 |
$50.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 4
|
$35.90 |
$14.45 |
$50.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 5
|
$36.11 |
$14.45 |
$50.56 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 1: GROUP 6
|
$36.41 |
$14.45 |
$50.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 1
|
$33.37 |
$14.45 |
$47.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 2
|
$30.03 |
$14.45 |
$44.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 3
|
$33.81 |
$14.45 |
$48.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 4
|
$34.16 |
$14.45 |
$48.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 5
|
$34.03 |
$14.45 |
$48.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 2: GROUP 6
|
$34.37 |
$14.45 |
$48.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 1
|
$32.62 |
$14.45 |
$47.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 2
|
$33.83 |
$14.45 |
$48.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 3
|
$33.12 |
$14.45 |
$47.57 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 4
|
$33.56 |
$14.45 |
$48.01 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 5
|
$33.18 |
$14.45 |
$47.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 3: GROUP 6
|
$33.61 |
$14.45 |
$48.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 1
|
$33.52 |
$13.45 |
$46.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 2
|
$33.73 |
$13.45 |
$47.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 3
|
$34.02 |
$13.45 |
$47.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 4
|
$34.46 |
$13.45 |
$47.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 5
|
$34.08 |
$13.45 |
$47.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER, AREA 4: GROUP 6
|
$34.51 |
$13.45 |
$47.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: DISTRIBUTION WORK: ZONE 1 - MACOMB, OAKLAND AND WAYNE DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DIST
|
$28.41 |
$13.45 |
$41.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: DISTRIBUTION WORK: ZONE 2 - MONROE AND WASHTENAW DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUT
|
$24.55 |
$13.45 |
$38.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: DISTRIBUTION WORK: ZONE 3 - BAY, GENESEE, LAPEER, MIDLAND, SAGINAW, SANILAC, SHIAWASSEE AND ST. CLAIR DISTRIBUTION WORK - THE CONSTRUCTION, I
|
$23.55 |
$13.45 |
$37.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: DISTRIBUTION WORK: ZONE 4 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINE
|
$22.92 |
$13.45 |
$36.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORER: DISTRIBUTION WORK: ZONE 5 - REMAINING COUNTIES IN MICHIGAN DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF
|
$22.95 |
$13.45 |
$36.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT: class a
|
$17.64 |
$12.90 |
$30.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT: class b
|
$18.64 |
$12.90 |
$31.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMI
|
$25.18 |
$12.90 |
$38.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY; KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA
|
$21.88 |
$13.26 |
$35.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES
|
$23.74 |
$12.95 |
$36.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY; LIVINGSTON COUNTY - ZONE 6
|
$26.33 |
$12.95 |
$39.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7
|
$24.20 |
$13.80 |
$38.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIR
|
$23.20 |
$13.80 |
$37.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4
|
$27.13 |
$14.95 |
$42.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY; AND WASHTENAW COUNTY - ZONE 3
|
$29.93 |
$14.20 |
$44.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY; AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIR
|
$28.93 |
$14.20 |
$43.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF
|
$29.93 |
$16.90 |
$46.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4
|
$31.75 |
$14.90 |
$46.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PR
|
$31.75 |
$14.90 |
$46.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 O
|
$29.93 |
$16.90 |
$46.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5
|
$26.21 |
$16.62 |
$42.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 1 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY
|
$28.72 |
$18.45 |
$47.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151); MONROE AND WASHTENAW COUNTIES) SCOPE OF WORK: OPEN CUT
|
$32.10 |
$17.45 |
$49.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY; JACKSON, LAPEER AND
|
$30.29 |
$17.45 |
$47.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVAT
|
$29.98 |
$22.75 |
$52.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 2 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY
|
$30.72 |
$18.45 |
$49.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL
|
$32.29 |
$17.45 |
$49.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL
|
$34.10 |
$17.45 |
$51.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL
|
$31.98 |
$22.75 |
$54.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL
|
$30.09 |
$19.45 |
$49.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 3 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY
|
$26.72 |
$18.45 |
$45.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R
|
$26.09 |
$19.45 |
$45.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R
|
$28.29 |
$17.45 |
$45.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R
|
$30.10 |
$17.45 |
$47.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R
|
$28.14 |
$22.75 |
$50.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1
|
$32.13 |
$17.95 |
$50.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1
|
$30.13 |
$22.75 |
$52.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2
|
$34.40 |
$17.95 |
$52.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2
|
$32.13 |
$22.75 |
$54.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3
|
$28.00 |
$17.45 |
$45.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3
|
$28.13 |
$22.75 |
$50.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN/DRIVER
|
$33.32 |
$18.40 |
$51.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH, TOWER TECH & FIBER OPTIC SPLICERS
|
$49.26 |
$23.66 |
$72.92 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST: REFERS TO A CREW OF ONLY ONE PERSON WORKING ALONE
|
$56.65 |
$26.09 |
$82.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: OPERATOR A OPERATOR A: SHALL BE PROFICIENT IN OPERATING ALL POWER EQUIPMENT INCLUDING: BACKHOE, EXCAVATOR, DIRECTIONAL BORE AND BOO
|
$41.71 |
$21.16 |
$62.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: OPERATOR B OPERATOR B: SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A
|
$38.98 |
$20.26 |
$59.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE PROTECTOR
|
$26.63 |
$14.45 |
$41.08 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE PROTECTOR (ZONE 2: STATEWIDE
|
$25.03 |
$14.45 |
$39.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$51.97 |
$28.25 |
$80.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$53.15 |
$28.25 |
$81.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$53.42 |
$28.25 |
$81.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$54.92 |
$28.25 |
$83.17 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
|
$56.42 |
$28.25 |
$84.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 1 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHO
|
$37.37 |
$15.44 |
$52.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 2 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHO
|
$35.33 |
$15.44 |
$50.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER AND FORKLIFT
|
$43.30 |
$25.00 |
$68.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER
|
$49.77 |
$25.00 |
$74.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER
|
$50.07 |
$24.60 |
$74.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER
|
$50.66 |
$25.00 |
$75.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1
|
$55.02 |
$28.25 |
$83.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10- TOWER CRANE & DERRICK OPERATOR ON A CRANE THAT REQUIRES AN OILER FOOTNOTE: PAID HOLIDAYS: NEW YEA
|
$52.70 |
$28.25 |
$80.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13- CRANE OPERATOR; JOB MECHANIC AND 3 DRUM HOIST AND EXCAVATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S D
|
$50.61 |
$28.25 |
$78.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14- CRANE OPERATOR ON A CRANE THAT REQUIRES AN OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIA
|
$51.61 |
$28.25 |
$79.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15- HOISTING OPERATOR; 2 DRUM HOIST AND RUBBER TIRED BACKHOE FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY
|
$49.97 |
$28.25 |
$78.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16- FORKLIFT AND 1 DRUM HOIST FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY
|
$46.77 |
$28.25 |
$75.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17- COMPRESSOR OR WELDER OPERATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JU
|
$32.29 |
$15.40 |
$47.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18- OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIV
|
$35.78 |
$28.25 |
$64.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2
|
$52.15 |
$28.25 |
$80.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3
|
$50.61 |
$28.25 |
$78.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4
|
$46.77 |
$28.25 |
$75.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5
|
$32.29 |
$15.40 |
$47.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6
|
$35.78 |
$28.25 |
$64.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9- TOWER CRANE & DERRICK OPERATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JU
|
$51.70 |
$28.25 |
$79.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK AND TOOLS
|
$48.90 |
$25.00 |
$73.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN
|
$41.76 |
$25.00 |
$66.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR
|
$47.12 |
$25.00 |
$72.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 1
|
$45.98 |
$25.25 |
$71.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 2
|
$41.25 |
$25.25 |
$66.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 3
|
$40.52 |
$25.25 |
$65.77 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 4
|
$39.95 |
$25.25 |
$65.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 5
|
$30.35 |
$12.10 |
$42.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER (ALLEGAN COUNTY; IONIA COUNTY; KENT, MECOSTA AND MONTCALM COUNTIES; NEWAYGO COUNTY; OSCEOLA COUNTY; OTTAWA COUNTY (TOWNSHIPS OF ALLENDALE, BLE
|
$25.49 |
$13.74 |
$39.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER (CLINTON COUNTY; EATON COUNTY; INGHAM COUNTY; IONIA COUNTY; LIVINGSTON COUNTY; AND SHIAWASSEE COUNTY)
|
$25.49 |
$13.74 |
$39.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER (MUSKEGON COUNTY; NEWAYGO COUNTY; OCEANA COUNTY; OTTAWA COUNTY:)
|
$25.49 |
$13.74 |
$39.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER FOOTNOTES: HIGH PAY: 30 TO 80 FT.: $.65 PER HOUR ADDITIONAL. 80 FT. AND OVER: $1.30 PER HOUR ADDITIONAL
|
$24.66 |
$14.99 |
$39.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: ALL OTHER WORK, INCLUDING MAINTENANCE OF INDUSTRIAL PLANT (ALCONA, ALPENA, ANTRIM, ARENAC, BAY, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFOR
|
$29.35 |
$19.05 |
$48.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH AND ROLLER (EXCLUDES: ALLEGAN COUNTY; INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN)
|
$23.74 |
$13.35 |
$37.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY, SANDBLAST, SIGN PAINTING (EXCLUDES: ALLEGAN COUNTY; INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH
|
$24.94 |
$13.35 |
$38.29 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: WORK PERFORMED ON WATER, BRIDGES OVER WATER OR MOVING TRAFFIC, RADIO AND POWERLINE TOWERS, ELEVATED TANKS, STEEPLES, SMOKE STACKS OVER 40 FT
|
$29.23 |
$19.11 |
$48.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAVEMENT MARKING MACHINE: GROUP 1 Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or
|
$33.37 |
$14.45 |
$47.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAVEMENT MARKING MACHINE: GROUP 1 Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or
|
$35.51 |
$14.45 |
$49.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAVEMENT MARKING MACHINE: GROUP 2 ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE
|
$31.96 |
$14.45 |
$46.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAVEMENT MARKING MACHINE: GROUP 2 ZONE 2: STATEWIDE
|
$30.03 |
$14.45 |
$44.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: ALL OTHER WORK: (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN
|
$24.19 |
$12.28 |
$36.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: WELDING IN CONJUNCTION WITH GAS DISTRIBUTION PIPELINE WORK (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, A
|
$33.03 |
$20.19 |
$53.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER, SIDE BOOM, TRENCHER, ENDLOAD
|
$39.78 |
$25.25 |
$65.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2 DOZER, ENDLOADER, SIDE BOOM, BACKFILLER, PUMPS, BOOM TRUCK, TRACTOR
|
$36.05 |
$25.25 |
$61.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 1 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL
|
$46.21 |
$25.25 |
$71.46 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 2 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL
|
$45.06 |
$25.25 |
$70.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 3 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL
|
$38.33 |
$25.25 |
$63.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 4 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL
|
$37.77 |
$25.25 |
$63.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SIGN INSTALLER GROUP 1
|
$22.03 |
$11.83 |
$33.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SIGN INSTALLER GROUP 1
|
$21.78 |
$11.83 |
$33.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS
|
$33.65 |
$0.75 |
$34.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS
|
$33.55 |
$0.75 |
$34.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER TRUCKS UNDER 8 CU. YDS
|
$33.50 |
$0.75 |
$34.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER TRUCKS UNDER 8 CU. YDS
|
$33.40 |
$0.75 |
$34.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER
|
$33.50 |
$0.75 |
$34.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER
|
$33.40 |
$0.75 |
$34.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1
|
$24.12 |
$19.04 |
$43.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1
|
$23.82 |
$19.04 |
$42.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2
|
$24.26 |
$19.04 |
$43.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2
|
$23.91 |
$19.04 |
$42.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3
|
$24.45 |
$19.04 |
$43.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3
|
$24.12 |
$19.04 |
$43.16 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL B
|
$29.98 |
$22.75 |
$52.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
WORK, PICK PULLERS AND THOSE HANDLING NEEDLES, BLOWING OFF BY AIR PRESSURE, AND ANY PERSON RIGGING: $1.00 PER HOUR ADDITIONAL. STEEPLEJACK, TANKS, GAS
|
$23.79 |
$12.02 |
$35.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |