Wage Determination ME20260051-17906-bld
Penobscot, ME · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination ME20260051-17906-bld covers 10 trade classifications for building construction in Penobscot, ME. Total packages (base + fringe) range from $20.00/hr to $69.20/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: ME20260051-17906-bld
Revision: 1
Type: building
County: Penobscot
State: ME
Effective: May 17, 2026
Trades covered: 10
Highest rate: $69.20/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $33.00 | $11.13 | $44.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.56 | $19.96 | $50.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.00 | $20.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.74 | $21.14 | $59.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $33.65 | $26.27 | $59.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.90 | $19.72 | $41.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.15 | $19.72 | $41.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.83 | $4.21 | $28.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $43.76 | $25.44 | $69.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $40.00 | $24.71 | $64.71 | $0.00 | $0.00 | $0.00 | $0.00 |