Wage Determination ME20260032-17610-hvy

Sagadahoc, ME · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination ME20260032-17610-hvy covers 15 trade classifications for heavy construction in Sagadahoc, ME. Total packages (base + fringe) range from $14.77/hr to $59.92/hr, with the highest going to IRONWORKER, REINFORCING. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ME20260032-17610-hvy
Revision: 1
Type: heavy
County: Sagadahoc
State: ME
Effective: May 17, 2026
Trades covered: 15
Highest rate: $59.92/hr
Official source: SAM.gov reference ME20260032View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $19.89 $8.23 $28.12 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.24 $7.01 $32.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $33.65 $26.27 $59.92 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $23.47 $11.63 $35.10 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $13.38 $1.39 $14.77 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.89 $3.90 $18.79 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $24.35 $15.65 $40.00 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $21.84 $6.42 $28.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.38 $3.48 $21.86 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.81 $4.37 $25.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.78 $8.13 $32.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.36 $3.73 $23.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.61 $3.44 $20.05 $0.00 $0.00 $0.00 $0.00
PAINTER $22.18 $6.33 $28.51 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.41 $3.17 $18.58 $0.00 $0.00 $0.00 $0.00
View all WDs for Sagadahoc → Revision history →