Wage Determination ME20260014-17970-bld

Waldo, ME · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination ME20260014-17970-bld covers 15 trade classifications for building construction in Waldo, ME. Total packages (base + fringe) range from $17.32/hr to $112.61/hr, with the highest going to CREDIT. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ME20260014-17970-bld
Revision: 1
Type: building
County: Waldo
State: ME
Effective: May 17, 2026
Trades covered: 15
Highest rate: $112.61/hr
Official source: SAM.gov reference ME20260014View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $43.91 $28.47 $72.38 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $19.56 $9.13 $28.69 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.13 $3.82 $19.95 $0.00 $0.00 $0.00 $0.00
CREDIT $74.17 $38.44 $112.61 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.84 $2.87 $19.71 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.27 $9.30 $34.57 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.17 $9.28 $31.45 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $33.65 $26.27 $59.92 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.96 $5.89 $20.85 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.33 $2.01 $20.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.42 $3.12 $23.54 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.98 $7.46 $31.44 $0.00 $0.00 $0.00 $0.00
PAINTER $15.86 $2.66 $18.52 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 16.97 1.92 PLUMBER, INCLUDES HVAC PIPE INSTALLATION $20.35 $5.09 $25.44 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.79 $2.53 $17.32 $0.00 $0.00 $0.00 $0.00
View all WDs for Waldo → Revision history →