Wage Determination MD20260060-15403-res
Anne Arundel, MD · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MD20260060-15403-res covers 20 trade classifications for residential construction in Anne Arundel, MD. Total packages (base + fringe) range from $11.95/hr to $48.66/hr, with the highest going to SOFT FLOOR LAYER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MD20260060-15403-res
Revision: 1
Type: residential
County: Anne Arundel
State: MD
Effective: May 17, 2026
Trades covered: 20
Highest rate: $48.66/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $26.20 | $7.43 | $33.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.80 | $0.31 | $18.11 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.92 | $0.00 | $18.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $19.09 | $5.00 | $24.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.27 | $0.62 | $17.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $23.49 | $0.81 | $24.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $17.31 | $0.00 | $17.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.95 | $0.00 | $11.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.26 | $0.00 | $12.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.71 | $0.00 | $14.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.19 | $2.15 | $18.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.40 | $4.42 | $22.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $20.25 | $2.06 | $22.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER, EXCLUDES DRYWALL FINISHING/TAPING | $15.12 | $0.88 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $17.60 | $0.00 | $17.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.63 | $0.60 | $23.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $26.80 | $0.00 | $26.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $17.83 | $1.20 | $19.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $34.12 | $14.54 | $48.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $26.06 | $6.52 | $32.58 | $0.00 | $0.00 | $0.00 | $0.00 |