Wage Determination MD20260032-16456-hvy
Calvert, MD · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MD20260032-16456-hvy covers 13 trade classifications for heavy construction in Calvert, MD. Total packages (base + fringe) range from $22.80/hr to $59.94/hr, with the highest going to INSULATION WORKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MD20260032-16456-hvy
Revision: 1
Type: heavy
County: Calvert
State: MD
Effective: May 17, 2026
Trades covered: 13
Highest rate: $59.94/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| INSULATION WORKER | $40.02 | $19.92 | $59.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $21.88 | $0.92 | $22.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $25.19 | $8.49 | $33.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $21.88 | $0.92 | $22.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $25.19 | $8.49 | $33.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $38.49 | $15.86 | $54.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $36.72 | $10.97 | $47.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $35.00 | $10.71 | $45.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $41.00 | $18.10 | $59.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR | $32.35 | $10.71 | $43.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $31.50 | $6.30 | $37.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $30.50 | $6.80 | $37.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $31.00 | $6.80 | $37.80 | $0.00 | $0.00 | $0.00 | $0.00 |