Wage Determination MA20260023-15428-hwy
Plymouth, MA · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MA20260023-15428-hwy covers 26 trade classifications for highway construction in Plymouth, MA. Total packages (base + fringe) range from $43.44/hr to $95.54/hr, with the highest going to IRONWORKER: ORNAMENTAL AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MA20260023-15428-hwy
Revision: 1
Type: highway
County: Plymouth
State: MA
Effective: May 17, 2026
Trades covered: 26
Highest rate: $95.54/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $50.10 | $31.45 | $81.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $45.13 | $13.86 | $58.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $44.52 | $19.36 | $63.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 | $95.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $33.25 | $22.92 | $56.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LANDSCAPE | $38.95 | $29.41 | $68.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $34.32 | $17.35 | $51.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $44.43 | $14.18 | $58.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SURFACER | $46.20 | $29.85 | $76.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FENCE ERECTION | $38.95 | $29.41 | $68.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUARDRAIL INSTALLATION | $38.95 | $29.81 | $68.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: JACK HAMMER | $38.69 | $17.33 | $56.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $48.74 | $11.79 | $60.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $41.63 | $23.04 | $64.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PILEDRIVER | $42.56 | $17.34 | $59.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $47.30 | $6.42 | $53.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; POST DRIVER | $57.83 | $33.70 | $91.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S | $57.18 | $33.70 | $90.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 | $66.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $37.35 | $11.00 | $48.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 | $0.00 | $0.00 | $0.00 | $0.00 |