Wage Determination MA20260022-15424-hwy

Norfolk, MA · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MA20260022-15424-hwy covers 25 trade classifications for highway construction in Norfolk, MA. Total packages (base + fringe) range from $43.44/hr to $103.25/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MA20260022-15424-hwy
Revision: 1
Type: highway
County: Norfolk
State: MA
Effective: May 17, 2026
Trades covered: 25
Highest rate: $103.25/hr
Official source: SAM.gov reference MA20260022View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $43.64 $22.09 $65.73 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $56.70 $21.08 $77.78 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $66.17 $37.08 $103.25 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $44.52 $19.36 $63.88 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $57.87 $37.67 $95.54 $0.00 $0.00 $0.00 $0.00
LABORER $38.95 $29.70 $68.65 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.65 $17.32 $50.97 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $38.95 $29.70 $68.65 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $44.43 $14.18 $58.61 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SURFACER $46.20 $29.85 $76.05 $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTION $38.95 $29.70 $68.65 $0.00 $0.00 $0.00 $0.00
LABORER: JACK HAMMER $38.69 $17.33 $56.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $64.67 $0.00 $64.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $48.74 $11.79 $60.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $42.56 $17.34 $59.90 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $47.30 $6.42 $53.72 $0.00 $0.00 $0.00 $0.00
PAINTER: STEEL $56.76 $36.00 $92.76 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; PAVER; POST DRIVER FOOTNOTE $57.83 $33.70 $91.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER $57.18 $33.70 $90.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL $57.83 $33.70 $91.53 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $23.00 $20.44 $43.44 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $53.35 $12.78 $66.13 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $37.74 $11.86 $49.60 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53 $0.00 $0.00 $0.00 $0.00
View all WDs for Norfolk → Revision history →