Wage Determination MA20260020-15437-hwy

Hampshire, MA · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MA20260020-15437-hwy covers 23 trade classifications for highway construction in Hampshire, MA. Total packages (base + fringe) range from $48.18/hr to $92.76/hr, with the highest going to PAINTER: STEEL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MA20260020-15437-hwy
Revision: 1
Type: highway
County: Hampshire
State: MA
Effective: May 17, 2026
Trades covered: 23
Highest rate: $92.76/hr
Official source: SAM.gov reference MA20260020View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $40.64 $20.80 $61.44 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $52.13 $20.89 $73.02 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.13 $13.41 $60.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $46.21 $21.27 $67.48 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $41.89 $33.90 $75.79 $0.00 $0.00 $0.00 $0.00
LABORER $35.00 $26.91 $61.91 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.10 $18.09 $51.19 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $35.00 $26.91 $61.91 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $44.43 $14.18 $58.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $51.63 $0.00 $51.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $48.14 $17.02 $65.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $43.87 $18.04 $61.91 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $37.50 $18.83 $56.33 $0.00 $0.00 $0.00 $0.00
PAINTER: STEEL $56.76 $36.00 $92.76 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; LOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOL $57.18 $33.70 $90.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BROOM/SWEEPER; CRANE; GRADALL; POST DRIVER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY $57.18 $33.70 $90.88 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHD $57.83 $33.70 $91.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 MILLING MACHINE; PAVER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDA $57.83 $33.70 $91.53 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, ME $39.12 $31.04 $70.16 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $43.73 $15.06 $58.79 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $30.00 $18.18 $48.18 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53 $0.00 $0.00 $0.00 $0.00
View all WDs for Hampshire → Revision history →