Wage Determination MA20260015-15431-hwy
Barnstable, MA · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination MA20260015-15431-hwy covers 25 trade classifications for highway construction in Barnstable, MA. Total packages (base + fringe) range from $43.44/hr to $95.54/hr, with the highest going to IRONWORKER: ORNAMENTAL AND STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: MA20260015-15431-hwy
Revision: 1
Type: highway
County: Barnstable
State: MA
Effective: May 17, 2026
Trades covered: 25
Highest rate: $95.54/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $43.64 | $22.09 | $65.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.02 | $31.05 | $81.07 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $44.52 | $19.36 | $63.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 | $95.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $35.00 | $26.91 | $61.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER LANDSCAPE | $38.95 | $29.41 | $68.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.65 | $17.32 | $50.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $38.95 | $29.41 | $68.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $44.43 | $14.18 | $58.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SURFACER | $46.20 | $29.85 | $76.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FENCE ERECTION | $38.95 | $29.41 | $68.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: JACK HAMMER | $38.69 | $17.33 | $56.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $48.74 | $11.79 | $60.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PILEDRIVER | $42.56 | $17.34 | $59.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $47.30 | $6.42 | $53.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; LOADER; PAVER; POST DRIVER | $57.83 | $33.70 | $91.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S | $57.18 | $33.70 | $90.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $53.35 | $12.78 | $66.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY | $40.78 | $37.35 | $78.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 | $0.00 | $0.00 | $0.00 | $0.00 |