Wage Determination MA20260010-15437-hvy

Hampshire, MA · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination MA20260010-15437-hvy covers 66 trade classifications for heavy construction in Hampshire, MA. Total packages (base + fringe) range from $53.66/hr to $113.58/hr, with the highest going to DIVER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: MA20260010-15437-hvy
Revision: 1
Type: heavy
County: Hampshire
State: MA
Effective: May 17, 2026
Trades covered: 66
Highest rate: $113.58/hr
Official source: SAM.gov reference MA20260010View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $50.62 $28.82 $79.44 $0.00 $0.00 $0.00 $0.00
BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS $50.81 $32.27 $83.08 $0.00 $0.00 $0.00 $0.00
CARPENTER $43.33 $27.82 $71.15 $0.00 $0.00 $0.00 $0.00
CARPENTER (FRANKLIN COUNTY) $43.33 $27.82 $71.15 $0.00 $0.00 $0.00 $0.00
CARPENTER (HAMPDEN; HAMPSHIRE; AND FRANKLIN) $43.33 $27.82 $71.15 $0.00 $0.00 $0.00 $0.00
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y $41.14 $37.35 $78.49 $0.00 $0.00 $0.00 $0.00
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y $41.02 $37.35 $78.37 $0.00 $0.00 $0.00 $0.00
DIVER $78.11 $35.47 $113.58 $0.00 $0.00 $0.00 $0.00
DIVER TENDER $61.70 $35.47 $97.17 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE) $52.16 $29.56 $81.72 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HAMPDEN; HAMPSHIRE) $52.16 $29.56 $81.72 $0.00 $0.00 $0.00 $0.00
INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER. HAZARDOUS WASTE PREMIUM $ $54.38 $31.04 $85.42 $0.00 $0.00 $0.00 $0.00
IRONWORKER (BERKSHIRE) $40.75 $31.91 $72.66 $0.00 $0.00 $0.00 $0.00
IRONWORKER (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE) $41.89 $33.90 $75.79 $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL, ORNAMENTAL, REINFORCING, FENCE ERECTOR, MACHINERY MOVER, RIGGER, RODMAN, STONE DERRICKMAN (BERKSHIRE)..$ 40.75 31.91 IRONWORK $41.00 $31.91 $72.91 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 ADZEMAN, WRECKING LABORER $46.25 $29.70 $75.95 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 CARPENTER TENDERS, CEMENT FINISHER TENDERS, LABORERS, WRECKING LABORERS (BERKSHIRE; HAMPSHIRE COUNTIES) $33.99 $26.65 $60.64 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS (FRANKLIN) $38.95 $29.70 $68.65 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL $39.20 $29.70 $68.90 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKERS, FENCE AND GUARD RAIL ERECTORS, LASER BEAM OPERATOR, MASON TENDER, PIPELAYER, PNEUMATIC DRILL OPERATOR, PNEUMATIC TOO $35.00 $29.70 $64.70 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKERS, FENCE AND GUARD RAIL ERECTORS, LASER BEAM OPERATOR, MASON TENDER, PIPELAYER, PNEUMATIC DRILL OPERATOR, PNEUMATIC TOO $33.99 $26.65 $60.64 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 BURNERS, JACKHAMMERS $47.00 $29.70 $76.70 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 AIR TRACK OPERATOR, BLOCK PAVERS, RAMMERS, CURB SETTERS (BERKSHIRE; HAMPSHIRE COUNTIES) $33.99 $26.65 $60.64 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 AIR TRACK OPERATOR, BLOCK PAVERS, RAMMERS, CURB SETTERS (FRANKLIN; HAMPDEN AND HAMPSHIRE COUNTIES) $35.00 $29.70 $64.70 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (FRANKLIN) $39.70 $29.70 $69.40 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS $47.25 $29.70 $76.95 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 BLASTER; POWDERMAN (FRANKLIN) $39.95 $29.70 $69.65 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 BLASTERS, POWDERMEN (BERKSHIRE; HAMPSHIRE COUNTIES) $33.99 $26.65 $60.64 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 YARDMAN $42.25 $29.70 $71.95 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 FLAGGERS (BERKSHIRE; HAMPSHIRE COUNTIES) $27.01 $26.65 $53.66 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 FLAGGERS (FRANKLIN; HAMPDEN AND HAMPSHIRE COUNTIES)..$ 27.01 29.70 LABORERS: GROUP 4 BLASTERS, POWDERMEN (FRANKLIN; HAMPDEN AND HAMP $35.00 $29.70 $64.70 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 PRECAST FLOOR AND ROOF, PLANK ERECTOR (FRANKLIN) $39.70 $29.70 $69.40 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 YARDMAN, BURNERS, SAWYERS $45.35 $29.70 $75.05 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (BERKSHIRE; HAMPSHIRE COUNTIES) $33.99 $26.65 $60.64 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN) $40.95 $29.70 $70.65 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN; HAMPDEN AND HAMPSHIRE COUNTIES) $35.00 $29.70 $64.70 $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE $46.25 $29.70 $75.95 $0.00 $0.00 $0.00 $0.00
LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER; SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; R $42.57 $31.04 $73.61 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $43.42 $33.00 $76.42 $0.00 $0.00 $0.00 $0.00
PAINTER REPAINT: BRIDGE $56.76 $31.85 $88.61 $0.00 $0.00 $0.00 $0.00
PAINTER REPAINT: BRUSH, TAPER $35.40 $31.85 $67.25 $0.00 $0.00 $0.00 $0.00
PAINTER REPAINT: SPRAY, SANDBLAST $36.80 $31.85 $68.65 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, TAPER $38.78 $31.85 $70.63 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY, SANDBLAST $39.48 $31.85 $71.33 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $51.97 $35.47 $87.44 $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (BERKSHIRE; FRANKLIN) $52.26 $31.05 $83.31 $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (FRANKLIN) $55.00 $31.57 $86.57 $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS (BERKSHIRE; FRANKLIN; HAMPDEN; HAMPSHIRE) $52.26 $31.05 $83.31 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES $42.88 $31.04 $73.92 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S $46.38 $31.04 $77.42 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD; TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL D $42.35 $31.04 $73.39 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE $39.12 $31.04 $70.16 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH $38.00 $31.04 $69.04 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQ $36.06 $31.04 $67.10 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR' $44.06 $31.04 $75.10 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHI $44.37 $31.04 $75.41 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $52.38 $31.04 $83.42 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $50.88 $31.04 $81.92 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $49.88 $31.04 $80.92 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $48.88 $31.04 $79.92 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $47.38 $31.04 $78.42 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA $40.78 $37.35 $78.13 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS $40.95 $37.35 $78.30 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTO $41.24 $37.35 $78.59 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA $41.53 $37.35 $78.88 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATE $41.82 $37.35 $79.17 $0.00 $0.00 $0.00 $0.00