Wage Determination KY20260105-15315-bld
Larue, KY · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination KY20260105-15315-bld covers 36 trade classifications for building construction in Larue, KY. Total packages (base + fringe) range from $21.05/hr to $72.29/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: KY20260105-15315-bld
Revision: 1
Type: building
County: Larue
State: KY
Effective: May 17, 2026
Trades covered: 36
Highest rate: $72.29/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $26.83 | $12.67 | $39.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.94 | $21.99 | $52.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $24.24 | $8.25 | $32.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $22.19 | $12.25 | $34.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $21.72 | $13.52 | $35.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $25.39 | $8.16 | $33.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORMWORK AND FLOOR LAYING - VINYL | $23.45 | $9.20 | $32.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: FLOOR LAYING-VINYL ONLY | $29.99 | $1.32 | $31.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.21 | $9.70 | $29.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.96 | $22.44 | $63.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.17 | $25.80 | $61.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $18.87 | $5.29 | $24.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $19.24 | $3.79 | $23.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE, POWER TOOL OPERATOR | $26.69 | $13.32 | $40.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $20.36 | $9.90 | $30.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.35 | $13.00 | $37.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $22.52 | $4.00 | $26.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $20.83 | $11.84 | $32.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $22.81 | $11.87 | $34.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.90 | $24.89 | $66.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.90 | $24.89 | $66.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $40.65 | $19.60 | $60.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $34.99 | $19.60 | $54.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING | $40.65 | $19.60 | $60.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $20.61 | $5.12 | $25.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.32 | $25.66 | $65.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $15.42 | $5.63 | $21.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $22.64 | $6.10 | $28.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $23.60 | $8.03 | $31.63 | $0.00 | $0.00 | $0.00 | $0.00 |