Wage Determination KY20260086-15315-hvy
Larue, KY · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination KY20260086-15315-hvy covers 21 trade classifications for heavy construction in Larue, KY. Total packages (base + fringe) range from $17.17/hr to $63.40/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: KY20260086-15315-hvy
Revision: 1
Type: heavy
County: Larue
State: KY
Effective: May 17, 2026
Trades covered: 21
Highest rate: $63.40/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $33.89 | $24.06 | $57.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.96 | $22.44 | $63.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $25.46 | $17.49 | $42.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND REINFORCING | $36.17 | $25.80 | $61.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $17.17 | $0.00 | $17.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE FINISHING | $29.84 | $17.59 | $47.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $35.69 | $14.45 | $50.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE WORKER | $28.94 | $17.59 | $46.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $35.52 | $14.45 | $49.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $18.56 | $4.50 | $23.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.85 | $5.00 | $25.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $25.35 | $16.74 | $42.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ | $38.69 | $19.60 | $58.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVE | $38.37 | $19.60 | $57.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH | $41.55 | $19.60 | $61.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.80 | $4.06 | $20.86 | $0.00 | $0.00 | $0.00 | $0.00 |