Wage Determination KY20260072-15314-hvy

Jefferson, KY · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination KY20260072-15314-hvy covers 28 trade classifications for heavy construction in Jefferson, KY. Total packages (base + fringe) range from $20.86/hr to $63.40/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: KY20260072-15314-hvy
Revision: 1
Type: heavy
County: Jefferson
State: KY
Effective: May 17, 2026
Trades covered: 28
Highest rate: $63.40/hr
Official source: SAM.gov reference KY20260072View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.46 $17.49 $42.95 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $36.17 $25.80 $61.97 $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER $19.64 $10.08 $29.72 $0.00 $0.00 $0.00 $0.00
LABORER: BLASTER, TUNNEL; CONCRETE FINISHING & POWDERMAN $29.84 $17.59 $47.43 $0.00 $0.00 $0.00 $0.00
LABORER: CARPENTER TENDER & CONCRETE WORKER & SIGNAL MAN $28.94 $17.59 $46.53 $0.00 $0.00 $0.00 $0.00
LABORER: CHIPPING GUNS & VIBRATING PLATE $27.12 $19.66 $46.78 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.30 $10.40 $29.70 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $35.69 $14.45 $50.14 $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 $0.00 $0.00 $0.00 $0.00
LABORER: FORM-STRIPPING, GRADE CHECKER $26.87 $19.66 $46.53 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $27.87 $0.00 $27.87 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $35.64 $20.39 $56.03 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $29.70 $18.66 $48.36 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS $38.69 $15.25 $53.94 $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRUCK DRIVER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRIS $16.93 $9.77 $26.70 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.76 $13.00 $39.76 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.60 $15.64 $40.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $40.05 $19.10 $59.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.50 $13.00 $39.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.81 $13.00 $38.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.39 $13.00 $36.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.34 $12.58 $38.92 $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.69 $19.60 $58.29 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVE $38.37 $19.60 $57.97 $0.00 $0.00 $0.00 $0.00
RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH $41.55 $19.60 $61.15 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.80 $4.06 $20.86 $0.00 $0.00 $0.00 $0.00
View all WDs for Jefferson → Revision history →