Wage Determination KY20260071-16806-hvy

Henderson, KY · heavy · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination KY20260071-16806-hvy covers 19 trade classifications for heavy construction in Henderson, KY. Total packages (base + fringe) range from $22.89/hr to $61.97/hr, with the highest going to IRONWORKER: ORNAMENTAL AND REINFORCING. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: KY20260071-16806-hvy
Revision: 1
Type: heavy
County: Henderson
State: KY
Effective: May 17, 2026
Trades covered: 19
Highest rate: $61.97/hr
Official source: SAM.gov reference KY20260071View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.10 $20.03 $57.13 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.46 $17.49 $42.95 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $36.17 $25.80 $61.97 $0.00 $0.00 $0.00 $0.00
LABORER (JACK HAMMER, PIPELAYER; TAMPER) $28.80 $18.77 $47.57 $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER, COMMON OR GENERAL, CONCRETE WORKER, FORM STRIPPING & GRADE CHECKER $28.55 $18.77 $47.32 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE FINISHING $29.45 $18.77 $48.22 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.84 $17.59 $47.43 $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $40.05 $19.10 $59.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $23.63 $10.98 $34.61 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $40.05 $19.10 $59.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $24.34 $13.00 $37.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $20.21 $13.00 $33.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.34 $12.58 $38.92 $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.37 $19.60 $57.97 $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.69 $19.60 $58.29 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE $41.55 $19.60 $61.15 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.69 $6.20 $22.89 $0.00 $0.00 $0.00 $0.00
View all WDs for Henderson → Revision history →