Wage Determination KY20260043-15275-bld
Lee, KY · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination KY20260043-15275-bld covers 36 trade classifications for building construction in Lee, KY. Total packages (base + fringe) range from $23.32/hr to $72.29/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: KY20260043-15275-bld
Revision: 1
Type: building
County: Lee
State: KY
Effective: May 17, 2026
Trades covered: 36
Highest rate: $72.29/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $24.61 | $11.88 | $36.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $37.04 | $26.57 | $63.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, HARDWOOD FLOOR LAYING, AND METAL STUD INSTALLATION..$ 25.25 12.07 CARPENTER | $20.69 | $9.05 | $29.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $33.60 | $16.05 | $49.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.15 | $29.35 | $70.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $32.89 | $14.33 | $47.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $36.73 | $27.05 | $63.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $20.36 | $11.20 | $31.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $28.16 | $17.55 | $45.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.27 | $10.42 | $32.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $28.53 | $17.38 | $45.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: POWER TOOL OPERATOR | $28.73 | $19.36 | $48.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $40.10 | $29.59 | $69.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.56 | $11.05 | $34.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $34.29 | $23.95 | $58.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.36 | $7.07 | $25.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $42.75 | $25.76 | $68.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $25.63 | $20.94 | $46.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $32.60 | $18.78 | $51.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $34.99 | $19.60 | $54.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| RADIUS & OVER OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $41.70 | $29.59 | $71.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $39.70 | $29.59 | $69.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $22.31 | $7.41 | $29.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.32 | $25.66 | $65.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $22.86 | $13.00 | $35.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $17.67 | $7.45 | $25.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $25.77 | $6.10 | $31.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $17.07 | $6.25 | $23.32 | $0.00 | $0.00 | $0.00 | $0.00 |