Wage Determination KS20260149-15246-hwy
Sumner, KS · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination KS20260149-15246-hwy covers 37 trade classifications for highway construction in Sumner, KS. Total packages (base + fringe) range from $12.83/hr to $73.25/hr, with the highest going to IRONWORKER, STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: KS20260149-15246-hwy
Revision: 1
Type: highway
County: Sumner
State: KS
Effective: May 17, 2026
Trades covered: 37
Highest rate: $73.25/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $16.74 | $0.00 | $16.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.59 | $0.00 | $16.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.64 | $18.29 | $58.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $16.32 | $0.00 | $16.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.03 | $0.00 | $13.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.29 | $0.00 | $15.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $29.21 | $14.63 | $43.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $12.83 | $0.00 | $12.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $26.56 | $13.05 | $39.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.06 | $0.00 | $20.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.45 | $0.00 | $16.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $15.49 | $0.00 | $15.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.27 | $0.00 | $19.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $17.80 | $0.00 | $17.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $22.40 | $4.39 | $26.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $15.55 | $0.00 | $15.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $18.40 | $0.00 | $18.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.13 | $0.00 | $17.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $17.24 | $0.00 | $17.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $21.18 | $0.00 | $21.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $16.66 | $0.00 | $16.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.74 | $0.00 | $14.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL | $18.53 | $0.00 | $18.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL GROUNDMAN | $16.36 | $0.00 | $16.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $17.88 | $0.00 | $17.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $16.77 | $0.00 | $16.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: STRIPING MACHINE | $27.02 | $12.14 | $39.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $15.97 | $0.00 | $15.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: SERVICE DRIVER | $14.13 | $0.00 | $14.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION | $16.40 | $0.00 | $16.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND TANDEM | $16.34 | $0.00 | $16.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.23 | $9.89 | $33.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $19.06 | $0.00 | $19.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $21.94 | $11.51 | $33.45 | $0.00 | $0.00 | $0.00 | $0.00 |