Wage Determination KS20260148-15177-hwy

Shawnee, KS · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination KS20260148-15177-hwy covers 34 trade classifications for highway construction in Shawnee, KS. Total packages (base + fringe) range from $13.20/hr to $73.25/hr, with the highest going to IRONWORKER, STRUCTURAL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: KS20260148-15177-hwy
Revision: 1
Type: highway
County: Shawnee
State: KS
Effective: May 17, 2026
Trades covered: 34
Highest rate: $73.25/hr
Official source: SAM.gov reference KS20260148View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $17.12 $4.74 $21.86 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.45 $10.10 $37.55 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.93 $14.14 $44.07 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $30.50 $27.05 $57.55 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $34.25 $73.25 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.30 $8.37 $25.67 $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.21 $14.63 $43.84 $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $13.20 $0.00 $13.20 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $32.12 $14.73 $46.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.78 $11.94 $38.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.75 $11.31 $33.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.17 $0.00 $19.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.35 $5.41 $24.76 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.18 $6.96 $28.14 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.14 $9.03 $34.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.87 $4.26 $23.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $14.65 $0.00 $14.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.45 $9.49 $34.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.84 $15.53 $43.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.09 $0.00 $16.09 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL $21.05 $0.00 $21.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $18.43 $0.00 $18.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.67 $0.00 $17.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $16.93 $0.00 $16.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $27.27 $12.25 $39.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.96 $0.00 $16.96 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $15.76 $0.00 $15.76 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION $16.54 $0.00 $16.54 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $23.23 $11.51 $34.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $23.82 $9.89 $33.71 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $19.06 $0.00 $19.06 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $22.45 $11.51 $33.96 $0.00 $0.00 $0.00 $0.00
View all WDs for Shawnee → Revision history →