|
(DUBOIS, GIBSON, PERRY, PIKE, LINE CONSTRUCTION: GROUNDMAN, CLASS A
|
$33.96 |
$19.04 |
$53.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR
|
$56.02 |
$37.24 |
$93.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF ME
|
$38.19 |
$23.59 |
$61.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF
|
$38.56 |
$18.70 |
$57.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O
|
$37.25 |
$19.85 |
$57.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES O
|
$30.00 |
$20.89 |
$50.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP
|
$40.20 |
$25.68 |
$65.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL S
|
$35.23 |
$22.79 |
$58.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER
|
$35.34 |
$21.72 |
$57.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, CAULKER, CLEANER, POINTER
|
$34.00 |
$19.71 |
$53.71 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONE MASON, POINTER, CAULKING
|
$36.24 |
$17.39 |
$53.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONEMASON
|
$35.21 |
$18.19 |
$53.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER
|
$35.83 |
$20.89 |
$56.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER
|
$33.75 |
$20.12 |
$53.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/ CLEANER/CAULKER
|
$38.16 |
$18.22 |
$56.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MASONS
|
$33.70 |
$16.57 |
$50.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: CEMENT MASON
|
$37.16 |
$18.22 |
$55.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER
|
$42.05 |
$28.22 |
$70.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER
|
$35.00 |
$21.60 |
$56.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: TERRAZO FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: TERRAZZO WORKER
|
$37.97 |
$18.06 |
$56.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
BRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKER
|
$38.16 |
$18.22 |
$56.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$31.09 |
$28.53 |
$59.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$34.69 |
$25.59 |
$60.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$30.52 |
$29.11 |
$59.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$35.14 |
$25.10 |
$60.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$30.59 |
$29.03 |
$59.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$30.94 |
$29.08 |
$60.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$33.74 |
$25.84 |
$59.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$34.06 |
$25.67 |
$59.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$45.91 |
$35.90 |
$81.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER
|
$34.55 |
$25.59 |
$60.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER (BARTHOLOMEW, BROWN,, DECATUR, FRANKLIN, JOHNSON , RUSH AND SHELBY COUNTIES)
|
$34.25 |
$25.59 |
$59.84 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CARPENTER (HAMILTON, HANCOCK, HENDRICKS, JOHNSON, AND MARION COUNTIES)
|
$35.80 |
$25.59 |
$61.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$25.75 |
$13.50 |
$39.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$28.50 |
$13.50 |
$42.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER
|
$23.38 |
$11.94 |
$35.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER (ELKHART, FULTON AND MARSHALL COUNTIES; PULASKI COUNTY)
|
$31.50 |
$14.30 |
$45.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER (PULASKI, JASPER, ALL OF STARKE COUNTY)
|
$36.01 |
$25.40 |
$61.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLI
|
$33.50 |
$21.95 |
$55.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #165
|
$41.24 |
$24.55 |
$65.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #406
|
$43.72 |
$35.59 |
$79.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #532 (BOONE, HAMILTON; HANCOCK COUNTY; HENDRICKS, JOHNSON, MARION AND MORGAN COUNTIES)
|
$35.00 |
$20.61 |
$55.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #566
|
$32.50 |
$20.77 |
$53.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #821
|
$30.02 |
$18.20 |
$48.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #83
|
$32.55 |
$22.04 |
$54.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CEMENT MASON/CONCRETE FINISHER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES)
|
$32.55 |
$22.04 |
$54.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
COMMUNICATION TECHNICIAN
|
$26.50 |
$18.33 |
$44.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
COMMUNICATION TECHNICIAN
|
$30.00 |
$18.07 |
$48.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
CONCRETE PUMP; CONCRETE MESH DEPRESSOR, INDEPENDENTLY OPERATED; CONCRETE SPREADER, POWER-DRIVEN; END LOADER UNDER 1 1/2 CU. YD.; EXCAVATING LOADER, PO
|
$42.88 |
$23.35 |
$66.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$30.08 |
$17.23 |
$47.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$41.04 |
$18.94 |
$59.98 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$33.98 |
$18.04 |
$52.02 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$46.00 |
$29.23 |
$75.23 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$27.20 |
$14.54 |
$41.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$38.05 |
$22.32 |
$60.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.18 |
$23.18 |
$63.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$36.00 |
$21.51 |
$57.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.96 |
$22.44 |
$63.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$45.45 |
$28.19 |
$73.64 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$35.76 |
$18.96 |
$54.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$27.64 |
$13.23 |
$40.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$41.00 |
$27.36 |
$68.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.64 |
$20.46 |
$61.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$33.02 |
$16.10 |
$49.12 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$41.50 |
$31.23 |
$72.73 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$48.10 |
$31.28 |
$79.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$43.30 |
$25.32 |
$68.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$39.20 |
$17.95 |
$57.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$40.18 |
$22.15 |
$62.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN
|
$42.02 |
$23.07 |
$65.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ELECTRICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERANS DAY THANKSGIVING DAY AND CHRISTMAS DAY
|
$42.00 |
$24.15 |
$66.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$53.55 |
$44.88 |
$98.43 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$31.95 |
$17.75 |
$49.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$35.13 |
$19.57 |
$54.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$29.50 |
$19.02 |
$48.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$34.22 |
$24.67 |
$58.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER
|
$36.03 |
$20.55 |
$56.58 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
GLAZIER (JASPER AND NEWTON COUNTIES)
|
$44.09 |
$30.73 |
$74.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, W
|
$44.82 |
$34.00 |
$78.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS
|
$38.56 |
$18.70 |
$57.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS
|
$33.44 |
$21.84 |
$55.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS
|
$35.10 |
$19.39 |
$54.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS
|
$19.80 |
$13.30 |
$33.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS
|
$25.00 |
$13.70 |
$38.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERI
|
$23.00 |
$14.40 |
$37.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE, FULTON, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS, AND WHITLEY COUNTIES)
|
$35.40 |
$26.92 |
$62.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (BARTHOLOMEW, BENTON, BOONE, BROWN, CARROLL, CASS, CLAY, CLINTON, DAVIESS, DECATUR, DELAWARE, FAYETTE, FOUNTAIN,FRANKLIN, FULTON, GRANT, GR
|
$38.00 |
$26.39 |
$64.39 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (CLARK, CRAWFORD, FLOYD, HARRISON, JACKSON; JEFFERSON; JENNINGS, LAWRENCE, MARTIN, ORANGE, PERRY; SCOTT AND WASHINGTON COUNTIES:)
|
$36.17 |
$25.80 |
$61.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, AND WARRICK)
|
$35.34 |
$25.75 |
$61.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (ELKHART, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, PULASKI, AND STARKE COUNTIES)
|
$39.76 |
$25.00 |
$64.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER (JASPER, NEWTON, PULASKI COUNTIES)
|
$47.75 |
$41.28 |
$89.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: REINFORCING (DEARBORN, DECATUR, FAYETTE, FRANKLIN, OHIO, RIPLEY, SWITZERLAND AND JENNINGS COUNTIES)
|
$36.17 |
$25.80 |
$61.97 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKER: SHEETER (JASPER, NEWTON, PULASKI COUNTIES)
|
$48.00 |
$41.28 |
$89.28 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: (FAYETTE, RANDOLPH UNION AND WAYNE COUNTIES)
|
$35.39 |
$24.35 |
$59.74 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: FENCE ERECTORS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION)
|
$35.88 |
$23.90 |
$59.78 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: ORNAMENTAL (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UNION)
|
$37.77 |
$23.90 |
$61.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
IRONWORKERS: STRUCTURAL, MACHINERY MOVERS, RIGGERS (DEARBORN, DECATUR, FAYETTE, FRANKLIN, JEFFERSON, JENNINGS, OHIO, RIPLEY, RUSH, SWITZERLAND, AND UN
|
$37.77 |
$23.90 |
$61.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOBLE, PULASKI, AND STARKE COUNTIES)
|
$24.30 |
$30.85 |
$55.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S
|
$33.45 |
$27.50 |
$60.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER, CARPENTER TENDER, FENCE ERECTOR, GRADE CHECKER, GUARD RAIL ERECTOR, CONTINUOUS S
|
$30.68 |
$27.50 |
$58.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM
|
$33.75 |
$27.50 |
$61.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEM
|
$30.98 |
$27.50 |
$58.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW
|
$34.45 |
$27.50 |
$61.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY & HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW
|
$31.68 |
$27.50 |
$59.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JO
|
$28.50 |
$17.72 |
$46.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, T
|
$29.00 |
$17.72 |
$46.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LE
|
$29.50 |
$17.72 |
$47.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; LI
|
$30.65 |
$18.22 |
$48.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L
|
$33.45 |
$27.50 |
$60.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L
|
$30.68 |
$27.50 |
$58.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 1 CONSTRUCTION LABORER; FENCE ERECTOR; FLAGGER; GRADE CHECKER; GUARD RAIL ERECTOR; WIRE MESH LAYER; JOINT MAN; L
|
$30.65 |
$18.00 |
$48.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O
|
$33.75 |
$27.50 |
$61.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O
|
$30.98 |
$27.50 |
$58.48 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O
|
$31.15 |
$18.00 |
$49.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER; LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY O
|
$31.15 |
$18.22 |
$49.37 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON
|
$34.45 |
$27.50 |
$61.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON
|
$31.68 |
$27.50 |
$59.18 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CON
|
$31.65 |
$18.00 |
$49.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; HOD
|
$31.65 |
$18.00 |
$49.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; HOD CARRIER; GENERAL
|
$31.65 |
$18.00 |
$49.65 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: EQUIPMENT OPERATOR
|
$39.11 |
$17.13 |
$56.24 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN
|
$25.90 |
$13.97 |
$39.87 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER
|
$31.49 |
$16.93 |
$48.42 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR
|
$43.19 |
$21.81 |
$65.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR: ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER)
|
$49.30 |
$23.64 |
$72.94 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION: LINEMAN
|
$60.15 |
$26.90 |
$87.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION:: LINEMAN
|
$50.28 |
$22.38 |
$72.66 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
LINE CONSTRUCTION:: LINEMAN & CABLE SPLICERS
|
$44.52 |
$18.43 |
$62.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$47.92 |
$37.23 |
$85.15 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT
|
$39.10 |
$26.94 |
$66.04 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT (HAMILTON AND MARION COUNTIES, AND THE FOLLOWING TOWNSHIPS IN JOHNSON COUNTY: CAMP ATTERBURY, CLARK, PLEASANT, AND WHITE RIVER)
|
$26.81 |
$19.28 |
$46.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT: ZONE 1: POSEY, VANDERBURGH AND WARRICK COUNTIES
|
$36.30 |
$28.37 |
$64.67 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
MILLWRIGHT: ZONE 2: GIBSON, GREENE AND SULLIVAN COUNTIES
|
$35.00 |
$29.33 |
$64.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
NATURE), GUARDRAIL POST DRIVER, LEAD GREASER, HELICOPTER, HIGHLIFT SHOVEL, HOIST, HOIST, HYDRAULIC POWER UNITS HYDRO OR WATER BLASTER, LOCOMOTIVE OPER
|
$48.70 |
$45.93 |
$94.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER BRUSH, ROLLER
|
$31.02 |
$16.89 |
$47.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER SPRAY AND SAND-BLASTING
|
$30.52 |
$15.89 |
$46.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRIDGES, LEAD ABATEMENT
|
$31.68 |
$14.46 |
$46.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING
|
$32.50 |
$19.86 |
$52.36 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH & ROLLER, PAPERHANGER, DRYWALL TAPING
|
$30.34 |
$14.46 |
$44.80 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: BRUSH AND ROLLER
|
$31.15 |
$18.76 |
$49.91 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SANDBLASTING, WATERBLASTING
|
$31.68 |
$14.46 |
$46.14 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY
|
$28.79 |
$14.46 |
$43.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY
|
$33.00 |
$19.86 |
$52.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTER: SPRAY AND SANDBLASTING
|
$32.10 |
$18.76 |
$50.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER
|
$41.00 |
$31.26 |
$72.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OV
|
$31.20 |
$15.55 |
$46.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL S
|
$31.12 |
$21.20 |
$52.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH & ROLLER OF MASTICS, CREOSOTES, KEWINCH KOATE, & COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL
|
$31.12 |
$21.20 |
$52.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH AND ROLLER
|
$41.00 |
$31.26 |
$72.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH, ROLLER & PAPERHANGER
|
$37.42 |
$15.99 |
$53.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH, ROLLER, PAPERHANGER, & DRYWALL FINISHING
|
$27.04 |
$16.27 |
$43.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: BRUSH; ROLLER; PAPERHANGING; DRYWALL FINISHERS
|
$25.10 |
$16.39 |
$41.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: DRYWALL FINISHERS FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE AL
|
$31.87 |
$21.20 |
$53.07 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: DRYWALL TAPING & FINISHING
|
$41.80 |
$31.26 |
$73.06 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: LEAD ABATEMENT
|
$32.24 |
$16.27 |
$48.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY & POT MAN FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES O
|
$32.20 |
$15.55 |
$47.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY & SANDBLAST POT TENDERS AND GROUND PERSONNEL
|
$27.04 |
$16.27 |
$43.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY, SANDBLAST & WATERBLAST
|
$37.42 |
$15.99 |
$53.41 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, & STEAM CLEANING
|
$27.04 |
$16.27 |
$43.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS: SPRAY/WATERBLASTING; SANDBLASTING
|
$26.10 |
$16.39 |
$42.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS:: SPRAY OF MASTICS CREOSOTES, KWINCH KOATE, COAL TAR EPOXY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES O
|
$32.12 |
$21.20 |
$53.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PAINTERS:: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES
|
$32.12 |
$21.20 |
$53.32 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PIPEFITTER (JASPER, AND NEWTON)
|
$48.50 |
$31.12 |
$79.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER
|
$25.69 |
$11.75 |
$37.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER: AREA #121 (BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, HOWARD, MIAMI, MONTGOMERY, TIPPECANOE, WARREN, WHITE AND VERMILLION COUNTIES)
|
$33.76 |
$20.05 |
$53.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER: AREA #46
|
$31.50 |
$18.32 |
$49.82 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER: AREA #83
|
$30.60 |
$17.19 |
$47.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLASTERER: AREA #83 (BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, JAY, MADISON, TIPTON, AND WABASH COUNTIES)
|
$30.60 |
$17.19 |
$47.79 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER (JASPER AND NEWTON COUNTIES)
|
$49.77 |
$28.56 |
$78.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER AND STEAMFITTER
|
$45.06 |
$23.16 |
$68.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER AND STEAMFITTER
|
$50.05 |
$20.39 |
$70.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER, PIPEFITTER, STEAMFITTER (JASPER, MARSHALL, PULASKI AND STARKE COUNTIES)
|
$44.93 |
$23.03 |
$67.96 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBER/PIPEFITTER
|
$32.00 |
$20.13 |
$52.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS
|
$46.42 |
$21.33 |
$67.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS
|
$46.65 |
$23.45 |
$70.10 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS
|
$40.70 |
$29.52 |
$70.22 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PLUMBERS AND PIPEFITTERS (BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JOHNSON AND MARION COUNTIES; MIAMI COUNTY; MORGAN, SHELBY AND TIPT
|
$50.05 |
$20.39 |
$70.44 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4 AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; BITUMINOUS PATCHING TAMPER
|
$34.55 |
$36.65 |
$71.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3 PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LES
|
$35.95 |
$36.65 |
$72.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE
|
$47.90 |
$45.93 |
$93.83 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRES
|
$43.60 |
$45.93 |
$89.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4 AIR COMPRESSORS, CONVEYOR, FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CU
|
$41.40 |
$45.93 |
$87.33 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER, OUTBOARD OR INBOARD MOTOR BOA
|
$35.95 |
$45.93 |
$81.88 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1 AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; A
|
$38.85 |
$36.65 |
$75.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2 AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS TYPE COMBINATION; BACK
|
$37.25 |
$36.65 |
$73.90 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 1- AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO
|
$44.60 |
$23.35 |
$67.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER; CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MACHI
|
$41.96 |
$23.35 |
$65.31 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: GROUP 4- AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHI
|
$40.46 |
$23.35 |
$63.81 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP C- AIR COMPRESSOR, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINO
|
$42.02 |
$19.60 |
$61.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1 (AIR COMPRESSOR OVER 600 CU FT, AIR COMPRESSORS, COMPRESSORS HOOKED IN MAN
|
$38.80 |
$27.15 |
$65.95 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2 AIR COMPRESSOR 600 CU. FT. AND UNDER, AIR TUGGER, AIR VALVES, ASSISTANT CO
|
$32.55 |
$27.15 |
$59.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:: GROUP A
|
$46.80 |
$19.60 |
$66.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
POWER EQUIPMENT OPERATORS:: GROUP B
|
$44.15 |
$19.60 |
$63.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL
|
$34.20 |
$15.55 |
$49.75 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$42.50 |
$25.76 |
$68.26 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$33.00 |
$19.51 |
$52.51 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$30.97 |
$14.66 |
$45.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$32.00 |
$16.61 |
$48.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER
|
$30.00 |
$18.30 |
$48.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: COMPOSITION
|
$34.55 |
$21.04 |
$55.59 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: COMPOSITION
|
$28.73 |
$20.81 |
$49.54 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: COMPOSITION
|
$24.38 |
$20.09 |
$44.47 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: COMPOSITION
|
$31.60 |
$19.43 |
$51.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: SLATE & TILE
|
$36.05 |
$21.04 |
$57.09 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: SLATE & TILE
|
$28.95 |
$20.81 |
$49.76 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: SLATE & TILE
|
$24.60 |
$20.09 |
$44.69 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
ROOFER: SLATE & TILE
|
$31.60 |
$19.43 |
$51.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$40.19 |
$27.33 |
$67.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$45.81 |
$26.57 |
$72.38 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$37.82 |
$26.37 |
$64.19 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
SHEET METAL WORKER
|
$40.91 |
$25.22 |
$66.13 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$23.38 |
$13.15 |
$36.53 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO GRINDER FINISHER
|
$31.00 |
$17.89 |
$48.89 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER MECHANIC
|
$36.30 |
$22.04 |
$58.34 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$36.38 |
$17.24 |
$53.62 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TERRAZZO WORKER/SETTER
|
$37.97 |
$18.06 |
$56.03 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE FINISHER
|
$24.33 |
$13.16 |
$37.49 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE FINISHER
|
$25.33 |
$14.19 |
$39.52 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE SETTER; MOSAIC WORKER
|
$35.83 |
$20.89 |
$56.72 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE & MARBLE SETTER; MOSAIC WORKER
|
$35.63 |
$17.23 |
$52.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE FINISHER
|
$29.08 |
$17.32 |
$46.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE SETTER
|
$29.08 |
$17.32 |
$46.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE SETTER & MARBLE MASON MECHANIC
|
$31.55 |
$19.08 |
$50.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE, MARBLE & TERRAZZO WORKER
|
$42.05 |
$28.22 |
$70.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE, MARBLE & TERRAZZO FINISHER
|
$31.55 |
$19.08 |
$50.63 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE, MARBLE SETTER
|
$35.63 |
$17.23 |
$52.86 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TILE, MARBLE SETTER
|
$37.22 |
$18.05 |
$55.27 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK
|
$34.69 |
$20.51 |
$55.20 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS
|
$34.74 |
$20.51 |
$55.25 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 3 SINGLE AXLE ""DOG-LEGS"", AND TANDEM TRUCK OR DOG- LEGS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVERS
|
$34.79 |
$20.51 |
$55.30 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS
|
$34.84 |
$20.51 |
$55.35 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 5 TANDEM TRUCKS OVER 15 TONS PAYLOAD; SINGLE AXLE SEMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS; TRUCKS PULLING TILT-T
|
$34.89 |
$20.51 |
$55.40 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 6 TANDEM TRUCKS OR ""DOG-LEGS""; SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; BU
|
$34.94 |
$20.51 |
$55.45 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 7 TRI-AXLE TRUCKS; TANDEM AXLE SEMI TRUCKS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS
|
$34.99 |
$20.51 |
$55.50 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 8 TANDEM-TANDEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS PUL
|
$35.04 |
$20.51 |
$55.55 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP 9 LOW-BOYS, TANDEM TRI-AXLE; ACEY WAGONS UP TO AND INCLUDING 3 BUCKETS; EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS K
|
$35.09 |
$20.51 |
$55.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP10 PICK-UP TRUCKS REMAINING COUNTIES
|
$34.54 |
$20.51 |
$55.05 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN REMAINING COUNTIES
|
$35.09 |
$20.51 |
$55.60 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
|
TRUCK DRIVER: GROUP12 ACEY WAGON; QUAD AXLE TRUCKS; ARTICULATING DUMP REMAINING COUNTIES
|
$35.19 |
$20.51 |
$55.70 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |