Wage Determination IL20260039-16725-res
Shelby, IL · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination IL20260039-16725-res covers 12 trade classifications for residential construction in Shelby, IL. Total packages (base + fringe) range from $12.67/hr to $69.46/hr, with the highest going to POWER EQUIPMENT OPERATOR: BACKHOE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: IL20260039-16725-res
Revision: 1
Type: residential
County: Shelby
State: IL
Effective: May 17, 2026
Trades covered: 12
Highest rate: $69.46/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $33.49 | $24.93 | $58.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.34 | $28.25 | $58.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (SHELBY COUNTY) | $22.50 | $9.75 | $32.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER (SHELBY COUNTY) | $32.60 | $18.91 | $51.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $28.05 | $16.73 | $44.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, UNSKILLED | $32.19 | $28.90 | $61.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH & ROLLER; PAPERHANGER & DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL | $30.50 | $22.30 | $52.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $37.88 | $25.71 | $63.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $40.71 | $28.75 | $69.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM | $31.25 | $22.30 | $53.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $12.67 | $0.00 | $12.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $21.00 | $10.19 | $31.19 | $0.00 | $0.00 | $0.00 | $0.00 |