Wage Determination ID20260105-17215-bld
Franklin, ID · building · Rev. 3 · Effective May 17, 2026
Quick Answer
Wage determination ID20260105-17215-bld covers 16 trade classifications for building construction in Franklin, ID. Total packages (base + fringe) range from $18.36/hr to $58.74/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: ID20260105-17215-bld
Revision: 3
Type: building
County: Franklin
State: ID
Effective: May 17, 2026
Trades covered: 16
Highest rate: $58.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $35.53 | $19.85 | $55.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $35.68 | $18.24 | $53.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.21 | $3.80 | $26.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $33.37 | $22.98 | $56.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $33.93 | $13.80 | $47.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $33.63 | $16.50 | $50.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $33.98 | $13.80 | $47.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.92 | $10.39 | $39.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $31.81 | $18.12 | $49.93 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $17.11 | $1.25 | $18.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $36.33 | $15.40 | $51.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $36.14 | $16.10 | $52.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $29.02 | $19.90 | $48.92 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.50 | $22.52 | $58.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $25.06 | $8.81 | $33.87 | $0.00 | $0.00 | $0.00 | $0.00 |