Wage Determination ID20260091-17201-hwy
Bannock, ID · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination ID20260091-17201-hwy covers 28 trade classifications for highway construction in Bannock, ID. Total packages (base + fringe) range from $22.35/hr to $53.68/hr, with the highest going to POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: ID20260091-17201-hwy
Revision: 1
Type: highway
County: Bannock
State: ID
Effective: May 17, 2026
Trades covered: 28
Highest rate: $53.68/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $26.24 | $9.48 | $35.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.84 | $33.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 | $34.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.33 | $11.45 | $37.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.38 | $7.63 | $27.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $19.18 | $7.65 | $26.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $20.64 | $7.37 | $28.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.34 | $10.90 | $33.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZON | $36.98 | $16.10 | $53.08 | $0.00 | $0.00 | $0.00 | $0.00 |
| MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE | $36.64 | $16.10 | $52.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $24.34 | $8.04 | $32.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $22.25 | $6.52 | $28.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $24.37 | $7.11 | $31.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $19.99 | $7.99 | $27.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $22.30 | $7.22 | $29.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PE | $36.33 | $16.10 | $52.43 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00 | $37.58 | $16.10 | $53.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.69 | $4.66 | $22.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $21.59 | $10.93 | $32.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $21.54 | $12.19 | $33.73 | $0.00 | $0.00 | $0.00 | $0.00 |