Wage Determination ID20260072-17228-hvy

Power, ID · heavy · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination ID20260072-17228-hvy covers 20 trade classifications for heavy construction in Power, ID. Total packages (base + fringe) range from $32.30/hr to $58.74/hr, with the highest going to ELECTRICIAN. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: ID20260072-17228-hvy
Revision: 2
Type: heavy
County: Power
State: ID
Effective: May 17, 2026
Trades covered: 20
Highest rate: $58.74/hr
Official source: SAM.gov reference ID20260072View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE $37.35 $16.10 $53.45 $0.00 $0.00 $0.00 $0.00
$30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE $36.81 $16.10 $52.91 $0.00 $0.00 $0.00 $0.00
CARPENTER $23.92 $9.03 $32.95 $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $26.06 $11.26 $37.32 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.43 $15.06 $37.49 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $18.74 $58.74 $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL OR COMMON ZONE DIFFERENTIAL: ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADI $32.15 $16.30 $48.45 $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $22.68 $10.90 $33.58 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.15 $10.15 $32.30 $0.00 $0.00 $0.00 $0.00
MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE $38.06 $16.10 $54.16 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $36.64 $16.10 $52.74 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILE $37.58 $16.10 $53.68 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5A DUMP $35.60 $17.00 $52.60 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5B DUMP $35.78 $17.00 $52.78 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5C DUMP $36.01 $17.00 $53.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5D DUMP $36.12 $17.00 $53.12 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5E DUMP $36.75 $17.00 $53.75 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, GROUP 5F DUMP $37.19 $17.00 $54.19 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.00 $13.42 $34.42 $0.00 $0.00 $0.00 $0.00
YDS TO AND INCLUDING 7YDS), OILER, SCRAPER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/ $36.98 $16.10 $53.08 $0.00 $0.00 $0.00 $0.00
View all WDs for Power → Revision history →