Wage Determination IA20260072-15991-bld

Pottawattamie, IA · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination IA20260072-15991-bld covers 26 trade classifications for building construction in Pottawattamie, IA. Total packages (base + fringe) range from $12.81/hr to $94.32/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: IA20260072-15991-bld
Revision: 1
Type: building
County: Pottawattamie
State: IA
Effective: May 17, 2026
Trades covered: 26
Highest rate: $94.32/hr
Official source: SAM.gov reference IA20260072View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.26 $20.54 $58.80 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.48 $33.91 $82.39 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $34.80 $19.24 $54.04 $0.00 $0.00 $0.00 $0.00
CARPENTER $21.35 $9.92 $31.27 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.29 $28.45 $60.74 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.40 $20.89 $67.29 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.97 $15.92 $48.89 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.53 $24.45 $59.98 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $37.50 $30.99 $68.49 $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $38.82 $17.04 $55.86 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.81 $0.00 $12.81 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.57 $0.00 $14.57 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.11 $0.00 $16.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.41 $0.00 $17.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.20 $9.62 $33.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $22.96 $7.49 $30.45 $0.00 $0.00 $0.00 $0.00
PAINTER $21.35 $8.54 $29.89 $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $19.77 $6.64 $26.41 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.20 $23.25 $66.45 $0.00 $0.00 $0.00 $0.00
PLUMBER $45.20 $23.25 $68.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BOBCAT/SKID STEER/SKID LOADER, LOADER WITH OR WITHOUT ATTACHMENTS, PAVER, ROLLER $34.70 $21.94 $56.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- BULLDOZER, LOADER $32.62 $21.94 $54.56 $0.00 $0.00 $0.00 $0.00
ROOFER $20.11 $4.99 $25.10 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $31.07 $9.72 $40.79 $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.80 $19.24 $54.04 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $55.88 $38.44 $94.32 $0.00 $0.00 $0.00 $0.00
View all WDs for Pottawattamie → Revision history →