Wage Determination IA20260049-15141-bld

Marshall, IA · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination IA20260049-15141-bld covers 30 trade classifications for building construction in Marshall, IA. Total packages (base + fringe) range from $14.81/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: IA20260049-15141-bld
Revision: 1
Type: building
County: Marshall
State: IA
Effective: May 17, 2026
Trades covered: 30
Highest rate: $94.74/hr
Official source: SAM.gov reference IA20260049View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $48.48 $33.91 $82.39 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $25.93 $9.70 $35.63 $0.00 $0.00 $0.00 $0.00
CARPENTER $34.25 $29.53 $63.78 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING $23.30 $12.28 $35.58 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.12 $11.07 $32.19 $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $31.82 $19.05 $50.87 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION $26.11 $6.56 $32.67 $0.00 $0.00 $0.00 $0.00
INSULATOR: MECHANICAL $19.04 $7.32 $26.36 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.29 $15.89 $41.18 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.30 $25.80 $62.10 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $37.50 $30.99 $68.49 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.25 $6.93 $24.18 $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.81 $0.00 $14.81 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $29.36 $17.99 $47.35 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.00 $2.70 $20.70 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.93 $28.05 $63.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $27.31 $15.35 $42.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.55 $22.85 $50.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.31 $8.36 $30.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.80 $17.19 $42.99 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.41 $16.30 $48.71 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $41.64 $23.22 $64.86 $0.00 $0.00 $0.00 $0.00
PLUMBER $31.85 $15.12 $46.97 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $40.75 $18.35 $59.10 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- FORKLIFT $35.29 $18.35 $53.64 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- FORKLIFT $37.62 $18.35 $55.97 $0.00 $0.00 $0.00 $0.00
ROOFER $14.00 $3.91 $17.91 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.38 $24.95 $64.33 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.99 $26.42 $72.41 $0.00 $0.00 $0.00 $0.00
YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY $56.30 $38.44 $94.74 $0.00 $0.00 $0.00 $0.00
View all WDs for Marshall → Revision history →