Wage Determination IA20260038-15098-bld
Clinton, IA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination IA20260038-15098-bld covers 29 trade classifications for building construction in Clinton, IA. Total packages (base + fringe) range from $14.81/hr to $94.74/hr, with the highest going to YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: IA20260038-15098-bld
Revision: 1
Type: building
County: Clinton
State: IA
Effective: May 17, 2026
Trades covered: 29
Highest rate: $94.74/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $48.48 | $33.91 | $82.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $25.93 | $9.70 | $35.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.55 | $24.75 | $55.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING) | $34.25 | $29.53 | $63.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 | $60.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $31.82 | $19.05 | $50.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $46.00 | $28.56 | $74.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR: MECHANICAL | $19.04 | $7.32 | $26.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $37.50 | $30.99 | $68.49 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 | $62.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $21.31 | $11.35 | $32.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $14.81 | $0.00 | $14.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $30.06 | $24.10 | $54.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $18.00 | $2.70 | $20.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $35.93 | $28.05 | $63.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.31 | $15.35 | $42.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.55 | $22.85 | $50.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 | $30.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $25.80 | $17.19 | $42.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 | $48.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $46.10 | $27.05 | $73.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $46.10 | $27.05 | $73.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $43.50 | $41.25 | $84.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.50 | $41.25 | $82.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $14.00 | $3.91 | $17.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $38.66 | $21.89 | $60.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $42.44 | $23.44 | $65.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $45.99 | $26.42 | $72.41 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | $0.00 | $0.00 | $0.00 | $0.00 |