Wage Determination GA20260306-16584-bld
Floyd, GA · building · Rev. 2 · Effective May 17, 2026
Quick Answer
Wage determination GA20260306-16584-bld covers 22 trade classifications for building construction in Floyd, GA. Total packages (base + fringe) range from $10.00/hr to $58.19/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260306-16584-bld
Revision: 2
Type: building
County: Floyd
State: GA
Effective: May 17, 2026
Trades covered: 22
Highest rate: $58.19/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.24 | $18.54 | $48.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $20.69 | $4.48 | $25.17 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.00 | $0.00 | $10.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $35.35 | $14.63 | $49.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $31.00 | $18.87 | $49.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $32.00 | $15.05 | $47.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.72 | $5.40 | $19.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.55 | $1.90 | $14.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.78 | $10.28 | $30.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.88 | $0.00 | $14.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.23 | $0.00 | $15.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $38.53 | $16.08 | $54.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $32.93 | $16.08 | $49.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $16.80 | $0.00 | $16.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $14.86 | $0.00 | $14.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.05 | $0.00 | $14.05 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $16.14 | $0.00 | $16.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $16.29 | $0.00 | $16.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $41.18 | $17.01 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $41.18 | $17.01 | $58.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $38.29 | $17.40 | $55.69 | $0.00 | $0.00 | $0.00 | $0.00 |