Wage Determination GA20260294-16682-hvy
Bryan, GA · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination GA20260294-16682-hvy covers 11 trade classifications for heavy construction in Bryan, GA. Total packages (base + fringe) range from $11.89/hr to $34.73/hr, with the highest going to CARPENTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260294-16682-hvy
Revision: 1
Type: heavy
County: Bryan
State: GA
Effective: May 17, 2026
Trades covered: 11
Highest rate: $34.73/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $24.02 | $10.71 | $34.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $24.34 | $4.53 | $28.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $21.40 | $4.25 | $25.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $23.67 | $8.02 | $31.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.81 | $2.44 | $18.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.95 | $0.00 | $16.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.31 | $3.29 | $25.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.29 | $0.00 | $16.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $25.45 | $0.00 | $25.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $22.13 | $0.00 | $22.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.89 | $0.00 | $11.89 | $0.00 | $0.00 | $0.00 | $0.00 |