Wage Determination GA20260291-16664-hvy
Lamar, GA · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination GA20260291-16664-hvy covers 12 trade classifications for heavy construction in Lamar, GA. Total packages (base + fringe) range from $11.89/hr to $38.54/hr, with the highest going to PIPEFITTER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260291-16664-hvy
Revision: 1
Type: heavy
County: Lamar
State: GA
Effective: May 17, 2026
Trades covered: 12
Highest rate: $38.54/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $19.99 | $0.00 | $19.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $21.64 | $3.90 | $25.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $19.02 | $3.29 | $22.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $28.39 | $9.15 | $37.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.98 | $1.38 | $15.36 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $17.11 | $3.23 | $20.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.17 | $4.70 | $28.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $16.29 | $0.00 | $16.29 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $25.45 | $0.00 | $25.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.86 | $0.65 | $18.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.89 | $0.00 | $11.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $24.72 | $13.82 | $38.54 | $0.00 | $0.00 | $0.00 | $0.00 |