Wage Determination GA20260166-16555-bld

Irwin, GA · building · Rev. 2 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination GA20260166-16555-bld covers 29 trade classifications for building construction in Irwin, GA. Total packages (base + fringe) range from $9.55/hr to $58.13/hr, with the highest going to BOILERMAKER. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: GA20260166-16555-bld
Revision: 2
Type: building
County: Irwin
State: GA
Effective: May 17, 2026
Trades covered: 29
Highest rate: $58.13/hr
Official source: SAM.gov reference GA20260166View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $34.21 $23.92 $58.13 $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $15.97 $1.95 $17.92 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.75 $0.00 $11.75 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $33.35 $13.40 $46.75 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $38.65 $12.75 $51.40 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $33.50 $13.86 $47.36 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $32.00 $14.71 $46.71 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING $29.50 $14.88 $44.38 $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $19.38 $14.42 $33.80 $0.00 $0.00 $0.00 $0.00
GLAZIER $13.19 $0.00 $13.19 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.72 $0.00 $17.72 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.75 $0.00 $16.75 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.55 $0.00 $9.55 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.33 $0.00 $13.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.00 $0.75 $15.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $16.00 $1.62 $17.62 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $16.38 $4.56 $20.94 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION $30.00 $16.66 $46.66 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION $38.98 $17.01 $55.99 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION $34.00 $16.35 $50.35 $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS $18.55 $3.35 $21.90 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $34.00 $17.70 $51.70 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $33.00 $17.70 $50.70 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $32.00 $17.70 $49.70 $0.00 $0.00 $0.00 $0.00
ROOFER $13.62 $0.00 $13.62 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $15.09 $3.53 $18.62 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: EXCLUDES HVAC DUCT INSTALLATION $37.75 $17.95 $55.70 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $19.25 $2.54 $21.79 $0.00 $0.00 $0.00 $0.00
View all WDs for Irwin → Revision history →