Wage Determination GA20260104-16606-bld
Rabun, GA · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination GA20260104-16606-bld covers 18 trade classifications for building construction in Rabun, GA. Total packages (base + fringe) range from $11.46/hr to $91.25/hr, with the highest going to ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260104-16606-bld
Revision: 1
Type: building
County: Rabun
State: GA
Effective: May 17, 2026
Trades covered: 18
Highest rate: $91.25/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $18.91 | $3.37 | $22.28 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.89 | $0.00 | $12.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $23.34 | $3.70 | $27.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK | $52.81 | $38.44 | $91.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS | $51.11 | $38.44 | $89.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKS | $52.08 | $38.44 | $90.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.46 | $0.00 | $11.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $38.53 | $16.08 | $54.61 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.77 | $0.27 | $15.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $17.54 | $1.27 | $18.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $13.62 | $0.00 | $13.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.77 0.00 SHEET METAL WORKER | $24.89 | $9.09 | $33.98 | $0.00 | $0.00 | $0.00 | $0.00 |