Wage Determination GA20260067-16623-hwy
Lincoln, GA · highway · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination GA20260067-16623-hwy covers 14 trade classifications for highway construction in Lincoln, GA. Total packages (base + fringe) range from $14.64/hr to $39.31/hr, with the highest going to OPERATOR: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260067-16623-hwy
Revision: 1
Type: highway
County: Lincoln
State: GA
Effective: May 17, 2026
Trades covered: 14
Highest rate: $39.31/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $32.68 | $0.00 | $32.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $28.44 | $0.00 | $28.44 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.72 | $2.23 | $18.95 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $22.42 | $0.00 | $22.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.40 | $3.73 | $27.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $22.82 | $0.00 | $22.82 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $39.31 | $0.00 | $39.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $26.31 | $5.43 | $31.74 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $22.81 | $1.91 | $24.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $23.22 | $4.10 | $27.32 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $18.51 | $3.99 | $22.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $14.64 | $0.00 | $14.64 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $21.58 | $3.58 | $25.16 | $0.00 | $0.00 | $0.00 | $0.00 |