Wage Determination GA20260021-16606-res
Rabun, GA · residential · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination GA20260021-16606-res covers 8 trade classifications for residential construction in Rabun, GA. Total packages (base + fringe) range from $7.88/hr to $14.40/hr, with the highest going to SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 9.73 0.00 PLUMBER. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: GA20260021-16606-res
Revision: 1
Type: residential
County: Rabun
State: GA
Effective: May 17, 2026
Trades covered: 8
Highest rate: $14.40/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $10.66 | $0.00 | $10.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $8.00 | $0.00 | $8.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $11.42 | $0.00 | $11.42 | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC | $10.51 | $0.00 | $10.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.88 | $0.00 | $7.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $11.89 | $0.00 | $11.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $10.45 | $0.00 | $10.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 9.73 0.00 PLUMBER | $14.40 | $0.00 | $14.40 | $0.00 | $0.00 | $0.00 | $0.00 |