Wage Determination GA20260003-16570-hwy

Bartow, GA · highway · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination GA20260003-16570-hwy covers 17 trade classifications for highway construction in Bartow, GA. Total packages (base + fringe) range from $17.56/hr to $39.31/hr, with the highest going to OPERATOR: CRANE. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: GA20260003-16570-hwy
Revision: 1
Type: highway
County: Bartow
State: GA
Effective: May 17, 2026
Trades covered: 17
Highest rate: $39.31/hr
Official source: SAM.gov reference GA20260003View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $32.68 $0.00 $32.68 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.37 $0.00 $30.37 $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $17.23 $2.23 $19.46 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.70 $0.00 $18.70 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $22.42 $0.00 $22.42 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.53 $3.63 $27.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.68 $2.59 $27.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.31 $0.00 $39.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.18 $4.28 $30.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.37 $1.40 $23.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $29.67 $6.29 $35.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.62 $4.10 $27.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.89 $3.99 $22.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $21.00 $4.22 $25.22 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $14.80 $2.76 $17.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.21 $3.58 $25.79 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $25.43 $4.00 $29.43 $0.00 $0.00 $0.00 $0.00
View all WDs for Bartow → Revision history →