Wage Determination FL20260200-16491-bld
Clay, FL · building · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination FL20260200-16491-bld covers 27 trade classifications for building construction in Clay, FL. Total packages (base + fringe) range from $13.51/hr to $89.55/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: FL20260200-16491-bld
Revision: 1
Type: building
County: Clay
State: FL
Effective: May 17, 2026
Trades covered: 27
Highest rate: $89.55/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $28.00 | $12.30 | $40.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.38 | $0.00 | $17.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $21.81 | $7.79 | $29.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 | $34.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $17.66 | $4.49 | $22.15 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $13.51 | $0.00 | $13.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.73 | $1.07 | $14.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.44 | $1.40 | $15.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE..$ 32.05 9.20 OPERATOR: CRANE | $33.05 | $9.20 | $42.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $23.25 | $9.20 | $32.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $14.83 | $1.84 | $16.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $32.05 | $9.20 | $41.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $23.50 | $9.20 | $32.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $15.62 | $2.05 | $17.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL | $51.11 | $38.44 | $89.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $37.50 | $17.59 | $55.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $37.50 | $17.59 | $55.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $16.99 | $0.00 | $16.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT AND UNIT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, D | $31.64 | $15.98 | $47.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $35.03 | $24.00 | $59.03 | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $18.01 | $0.00 | $18.01 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 | $2.12 | $15.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 | $0.00 | $0.00 | $0.00 | $0.00 |