Wage Determination FL20260198-16530-bld

Charlotte, FL · building · Rev. 1 · Effective May 17, 2026

Revision history →
Quick Answer

Wage determination FL20260198-16530-bld covers 30 trade classifications for building construction in Charlotte, FL. Total packages (base + fringe) range from $13.00/hr to $90.27/hr, with the highest going to PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL. Federal contracts of $2,000+ for this work must pay no less than the rates below.

WD Number: FL20260198-16530-bld
Revision: 1
Type: building
County: Charlotte
State: FL
Effective: May 17, 2026
Trades covered: 30
Highest rate: $90.27/hr
Official source: SAM.gov reference FL20260198View on SAM.gov →

Prevailing Wage Rates

Trade Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.12 $13.11 $43.23 $0.00 $0.00 $0.00 $0.00
CARPENTER $19.78 $8.05 $27.83 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.85 $0.60 $15.45 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.11 $14.59 $47.70 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.37 $12.65 $39.02 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.25 $17.32 $52.57 $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.90 $15.66 $44.56 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING $13.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $1.40 $15.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.07 $8.80 $30.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.40 $1.90 $17.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.57 $14.90 $52.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.38 $14.90 $54.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.40 $14.90 $55.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.07 $14.90 $51.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $26.75 $14.90 $41.65 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.97 $0.00 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.00 $1.40 $15.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $37.07 $14.90 $51.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.53 $14.90 $42.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.43 $4.78 $19.21 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.72 $2.13 $16.85 $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPL $51.83 $38.44 $90.27 $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $20.59 $7.49 $28.08 $0.00 $0.00 $0.00 $0.00
PLUMBER $21.14 $8.11 $29.25 $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.05 4.47 ROOFER $19.00 $1.17 $20.17 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.86 $7.94 $29.80 $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.01 $0.00 $18.01 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.22 $2.12 $15.34 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.24 $0.00 $14.24 $0.00 $0.00 $0.00 $0.00
View all WDs for Charlotte → Revision history →