Wage Determination FL20260097-16498-hvy
Putnam, FL · heavy · Rev. 1 · Effective May 17, 2026
Quick Answer
Wage determination FL20260097-16498-hvy covers 6 trade classifications for heavy construction in Putnam, FL. Total packages (base + fringe) range from $8.80/hr to $32.59/hr, with the highest going to PAINTER: BRUSH AND SPRAY. Federal contracts of $2,000+ for this work must pay no less than the rates below.
WD Number: FL20260097-16498-hvy
Revision: 1
Type: heavy
County: Putnam
State: FL
Effective: May 17, 2026
Trades covered: 6
Highest rate: $32.59/hr
Prevailing Wage Rates
| Trade | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| LABORER: COMMON OR GENERAL | $8.80 | $0.00 | $8.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.14 | $1.95 | $15.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.00 | $0.94 | $15.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $13.30 | $1.92 | $15.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND SPRAY | $20.21 | $12.38 | $32.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DISTRIBUTOR, DUMP, LOWBOY AND TANDEM..$ 11.55 0.00 OPERATOR: LOADER | $11.00 | $0.00 | $11.00 | $0.00 | $0.00 | $0.00 | $0.00 |